My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43077
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:53 PM
Creation date
11/23/2007 12:10:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
6/30/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__- =Golder <br />~SOClc'lfeS <br />June 23, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 6: June 13 through June 19, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Constmction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of June 13 through June <br />19, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 41° F to 50° F, and highs ranged from 61° F to 82° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Svnonsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction activities on six days of this seven-day reporting <br />period (June 13 through June 18, 2004). Poly-Flex conducted Phase IVc construction activities on six <br />days of this seven-day reporting period (June 14 through June 19, 2004). <br />Phase IVc <br />Ames constructed the Secondary Underdrain (SU) within Phase IVc along the central section of the <br />VLF Raven Hill azea. Ames constructed approximately 200 feet of SU. <br />Ames continued construction of the geogrid remediation for underground working UG-297. The first <br />layer of geogrid was installed and surveyed and Select Structural Fill (SSF) was compacted during this <br />reporting period. <br />Phase Nc 06 June 13-June 19 2004 043-2170 <br />