My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43066
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:53 PM
Creation date
11/23/2007 12:08:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985008
IBM Index Class Name
General Documents
Doc Date
4/26/2001
Doc Name
ORLANDO & ROSE MARIE MARTINEZ LEONE GARDNER PIT M-1985-008 RECLAMATION COST ESTIMATE SUMMARY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task u : 002 <br />Date : 04/26/2001 <br />User : LDO <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : Huerfano <br />Site :Leone -Gardner <br />Permitlobtl : M-1985-~08 <br />1 <br />a <br />Abbreviation :none <br />Filename : M008-002 <br />Agency or organization name : DMG <br />Permit or other job action :bond review <br />Task description :Spread 6" topsoil on area remaining to be mined <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : NA <br />Cost Breakdown <br /> Utilization <br />OwnershipcosUhour : $43.30 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cost hour : $27.99 NA <br />Total unit cosVhour : $137.56 Total fleet co~Vhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5,463 LCY <br />$137.56 <br />Swell Loose <br />factor: NA volume: 5,46 LCY <br />Source of estimated volume : Exhibit E -Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 685.7 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 10.00 °o (i <br />Average site altitude : 6,500 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />Adjusted unit production : 631.3 LCY/hr <br />Adjusted fleet production : 631. LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 8.651 Hours <br />Unit cost : $0.218 /LCY Total job cost : $1,1.,10 <br />Job Condition Correction Factors <br />Operator skill : 0.751 Source <br />(avg.) <br />Material consistency : 1.20 (Cat HBJ <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency: 0.83 (fshilUdal <br />Spoil pile : 0.70 (Ind-m/) <br />Push gradient : 1.22 (Cat HBJ <br />Altitude : 1.00 (Car HBJ <br />Material weight : 1.44! (Cat HBJ <br />Blade type : 1.00' (S/SU/U, <br />Net correction : .0.92, <br />Horsepower: 305 <br />Shif~ basis : 1 per day <br />Data #ource : (CRGJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.