My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43066
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:53 PM
Creation date
11/23/2007 12:08:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985008
IBM Index Class Name
General Documents
Doc Date
4/26/2001
Doc Name
ORLANDO & ROSE MARIE MARTINEZ LEONE GARDNER PIT M-1985-008 RECLAMATION COST ESTIMATE SUMMARY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task a : 001 <br />Date : 04/26/2001 <br />User: LDO <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : Huertano <br />Site :Leone -Gardner <br />Permivjobri : M-1985-ri08 <br />Abbreviation :none <br />Filename : M008-001 <br />Agency or organization name : DMG <br />Permit or other job action :bond review ~ <br />Task description :Grade 15' highwall to 3h : 1 v slope <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shit]I basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $43.30 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cosuhour : $137.56 Tota l fleet co~Uhour : $137.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,257 BCY factor : 1.120 volume : 3,6 8 LCY <br />Source of estimated volume : Exhibit E -Reclamation Plan <br />Source of estimated swell factor : cat hndbk <br />HOURLY PRODUCTION <br />Average push distance : 51 feet <br />Unadjusted hourly production : 7,627.0 LCY/hr <br />Material consistency description <br />Compacted /ill or embankment <br />Average push gradient : 75.00 % (~ <br />Average site altitude : 6,500 feet <br />Material weight : 3,250 Ibs/LCY <br />Weight description <br />Gravel - Pitrun <br />Source <br />Adjusted unit production : 659.2 LCY/hr <br />Adjusted fleet production : 659.2 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.5~ Hours <br />Unit cost : $0.208 /LCY Total job cost : $760 <br />Job Condition Correction Factors <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />
The URL can be used to link to this page
Your browser does not support the video tag.