Laserfiche WebLink
<br />i~ <br />East Wall <br />This wall is sheetrocked and painted. The door going into the master bath has not been installed. <br />The door frame contains 1/2" spacers on the underside of the door frame. The rest of the wall is <br />clear. <br />North Wall <br />The door-way going into the master bedroom contains 1/2" spacers on the underside between the <br />two 2x4s. The wood in the door frame is cracked. There is a substantial crack, looking north, on <br />the left side of the door frame. There is a very large splinter on it and the builder has tried to nail <br />it back to the board. The remainder of the wall is cleaz. <br />West Wall <br />The wall is sheetrocked and painted. This wall has a square window to the north and a circular <br />window to the south. The square window has paint shrinkage cracks where the sheetrock and the <br />metal window frame join. Around the circulaz window; the sheetrock hasn't been placed around <br />the window frame. <br />Floor <br />The floor is plywood. <br />Ceilin <br />The ceiling is sheetrock and painted. It is clear. <br />Master Bathroom <br />Floor <br />Floor is plywood. <br />Ceilin <br />sheetrocked and painted. <br />Bathtub/Shower Area <br />It has concrete fascia board for tile, but no file has been installed. The tub is installed and is cleaz. <br />