Laserfiche WebLink
<br />.._ <br />Charles L. Jackson <br />- 2 - <br />Topsoil Stockpile, Road and Canal Location <br />May 4, 1?RR <br />Your proposal to change the method of topsoil stockpiling and the <br />location of this and the referenced facilities appears to be 'fn <br />compliance with the applicable rules. Therefore, it is appro~~ed in <br />accordance with Rule 1,9 <br />This approval does not extend to the amount of topsoil necess~~ry to be <br />salvaged. The requirement to salvaoe enough material to repl~~ce <br />6-16 inches, or a 12-inch average, depth of soils remains a condition of <br />your permit until we've resolved the item noted above, "Topso~~1 <br />Replacement Requirements." <br />Approval of alternate bonding, topsoil salvage and facility location <br />reouirements should substantially reduce costs at the Henderson Mine. <br />I appreciate your consideration of our concerns with regard to topsoil <br />replacement reouirements and look forward to working with you on this issue. <br />If you have any questions, please contact me. <br />Si nce~el <br />~/ <br />l <br />~~~ <br />Edward L <br />Minerals <br />/, <br />B schoff ^ / <br />Prooram Su visor <br />ELB/hm <br />cc: Diana Bi11s <br />7141F <br />