My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42852
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:39 PM
Creation date
11/23/2007 12:01:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
General Documents
Doc Date
8/15/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~) <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAF1" SEALING <br />Task No.l Task Description ~ Cost (E) <br />________I________.._________________________________________I____________ <br />2 ~ Backfi ll. Cu[slope and Portal Area ~ 5811 <br />3 ~ Grade Closed Shaft Areas ~ E23 <br />5 ~ Portal c:l osure I E181 <br />7 ~ Portal bulkhead placement ~ E4,300 <br />Subtotal (K ): E8,285 <br />L. DRILL HOLE/hIONITORINC NE LL SEALING <br />Task No.l Task Description ~ Cost (E) <br />________I__________________________________________________I__________ <br />n/a <br /> Subtotal (L): <br /> <br />M. MISCELLANEOUS <br />RECLAMATION TASKS ____________ <br />Task No. <br />________ ~ <br />__________ Task Description <br />___ ~ Cost (E) <br /> <br />11 I <br />_ <br />Boradcast ______________________ <br />seed 2:1 slopes ______________I____________ <br />~ E993 <br />B ~ Demolition - Structure removal 58,952 <br />10 ~ Seeding Drill seed ~ E1, 099 <br /> fencing <br />12 Mob/Demob firom Cortez ~ E4,235 <br />________________________________________________________________________ <br />Subtotal (M ): E15,279 <br />____________ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E28, 268 <br />____________ <br />II. INDIRECT LOSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l <br />________ Item Description <br />__________________________________ <br />_______ <br />__ I <br />______ Cost (E) <br />___________ <br />I <br />1. ~ Public Liability Insurance.... _ <br />1.550% of dir. ~ E438 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ E276 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 82,827 <br />4. ~ Job Superintendent.. <br />Subt otat (A ): E3,541 <br />TOTAL CONSTRUI:TION CONTRACT AMOUNT (direct plus 0 8 P): E31,809 <br />____________ <br />B. DMG PROJECT I(DMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (E) <br />1. ~ Minerals Program Adm 5.00% of cnt r.l E7, 590 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B ): E1,890 <br />TOTAL INDIRECT f:ECLAMAT ION COSTS (subtotals A through B): E5,131 <br />TOTAL PERFORMANCE BOND AMOUNT (direct pf us indirect costs): E33,399 <br />
The URL can be used to link to this page
Your browser does not support the video tag.