Laserfiche WebLink
_ ~) <br />RECLAMATION COST SUMMARY tont'd sheet 3 of 4 <br />H. EARTHYORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description ~ Cost (E) <br />n/a <br />________________________________________________________________________ <br />Subtotal (H): <br />____________ <br />1. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />n/a <br />Subtotal (1): <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description I Cost (S) <br />________I_________-.________________________________________I___________. <br />b ~ Spread Topsoil ~ 81,132 <br />Subtotal (J): 51,132 <br />