Laserfiche WebLink
~. <br /> <br />-lo- <br />Stipulation. l3: MLR No. ?, OSM No. ?, Phase II - Waste Rock Pile <br />Status - Not complete, in compliance. The operator needs to complete <br />the designs prior to construction of the pile. <br />Conditions - Still need geocheinical/physical tests, revised design if <br />needed, and pile shall not exceed 50,000 cu. yd. <br />construction the pile. <br />Conditions - Need survey monuments, final designs. <br />Stipulation 14: MLR tJo. 34, OSM No. 31; Upper Waste Rock Pile <br />Status - Not Complete, in compliance. ~1ust resolve prior to <br />Stipulation 15: MLR No. 14, OSM iJo. 16, 2 "F" Seam Monitoring dells <br />Status - Resolved <br />Stipulation 16: MLR No. 15, OS'1fJo. 18; Z '.Jells Aoove Suosioence Test <br />an~T <br />Status - Not Complete, in compliance. Cannot be completed until later <br />mine development occurs. <br />Stipulation 17: MLR No. 16, OSt4 IJo. 19; .Jell Designs & Completion Report <br />Status - Resolved <br />Stipulation 18: MLR IJo. 30, OS~M iJO. 36, Shrub Density <br />Status - Resolved <br />Stipulation 19: MLR No. 4ti, OSi~1~JO. 43, Lands witn Prohibitions <br />Status - Resolved <br />Stipulation 20: MLR (Jo. 17, OS~4 IJo. 21, Spring Monitoring <br />Status - Ongoing <br />Stipulation 21: MLR IJo. 18, OSM IJo. 17, Monitoring I•lells <br />Status - Ongoing. This stipulation redefined during the review of the <br />annual hydrologic report. <br />Stipulation 22: MLR IJo. 22, OS14 No. 20, Quarterly Reports <br />Status - Ongoing <br />Stipulation 23: MLR IJo. 19, OSI~I IJo. 22, Quality Parameters <br />Status - Ongoing. This stipulation redefined during our review of the <br />annual hydrologic report. <br />