Laserfiche WebLink
<br />-9- <br /> <br />IC. Status.of Stipulations <br />Stipulations are referred to using the numbering system agreed upon by ~•ILRU, <br />OSi4 and Mt. Gunnison as found in the October 22, 1931 memo from Tom Gillis. <br />Stipulation l: MLR No. 28, OSM fJo. 34, Dry f4eadow Reference Area <br />Status - Resolved <br />Conditions - Annual Pnotoyraphic Survey ~ Report <br />Stipulation 2: MLR No. 2, OSM No. 23; Load-out Sediment Control <br />Status - Resolved <br />Stipulation 3: MLR No. 3, OSM ilo. 23, Stream Buffer Zones <br />Status - Resolved <br />Stipulation 4: ML•R IJo. 47, OS.4 No. 47; Reclamation Fees <br />Status - Resolved <br />Stipulation 5: MLR No. 35, OSM No. 29; Revised Culvert Designs <br />Status - Resolved <br />Stipulation 6: MLR No. 35, OSM No. 29; Trash Racks <br />Status - Resolved <br />Conditions - Trashracks were installed on culverts less than 3U inches. <br />Stipulation 7: MLR No. 37; Load-Out Sediment Control <br />Status - Resolved <br />Stipulation 8: MLR No. 40, OSM No. 7; Sealing Bo re holes <br />Status - Resolved <br />Stipulation 9: MLR .VO. 38, Sealing Wells and Portals <br />Status - Resolved <br />Stipulation 11: MLR No. 26, OSM No. 8; Topsoil Plan <br />Status - Resolved <br />Conditions - Bond to be revised. <br />Stipulation 12: MLR No. 27, OSM No. 9; Waste Rock Cover Material <br />Status - Ongoing (must cover w/4 ft. cover) <br />