Laserfiche WebLink
r~ <br />Stipulation No. 12 <br />`J <br />PRIOR TO AFFECTING THE LAND IN THE SOUTHWEST 1/4 SECTION 23, TOWNSHIP 20 <br />SOUTH, RANGE 70 WEST, THE OPERATOR SHALL SUBMIT RIGHT OF ENTRY <br />INFORMATION FROM THE OWNER. <br />Stipulation No. 13 <br />WITHIN 90 DAYS OF APPROVAL OF PERMIT REVISION N0. O1, THE OPERATOR SHALL <br />SUBMIT DOCUMENTATION THAT APPLICATION FOR A WELL PERMIT FOR THE <br />"NORTH DEWATERING WELL" HAS BEEN FILED WITH THE OFFICE OF THE STATE <br />ENGINEER. <br />Stipulation No. 14 <br />PEAK FLOWS SHALL BE MEASURED IN MAGPIE CREEK ON A QUARTERLY BASIS AT THE <br />CURRENT MONITORING STATION. DATA ACQUIRED FROM THIS MONITORING SHALL BE <br />SUBMITTED QUARTERLY AND INCLUDED IN THE ANNUAL HYDROLOGY REPORTS FOR THE <br />MINE. <br />Stipulation No. 15 <br />THE OPERATOR SHALL MONITOR FLOWS IN SECOND ALKALI CREEK SO AS TO MEASURE <br />MINIMUM AND MAXIMUM FLOWS DURING EACH QUARTER FOLLOWING APPROVAL OF <br />PERMIT REVISION N0. 1. DURING THE MONITORING YEAR, AT LEAST ONE GRAB <br />SAMPLE SHALL BE COLLECTED WHEN STREAMFLOW IS PRESENT. THIS SAMPLE SHALL <br />BE SUBMITTED FOR LAB ANALYSIS FOR TOTAL DISSOLVED SOLIDS, TOTAL SUSPENDED <br />SOLIDS, pH, TOTAL DISSOLVED IRON AND MANGANESE. RESULTS OF THESE <br />ANALYSES SHALL BE SUBMITTED TO THE DIVISION WITHIN 60 DAYS FOLLOWING THE <br />END OF THE FIRST MONITORING YEAR WHICN ENDS ON JUNE 30, 1992. <br />Stipulation No. 16 <br />WITHIN 30 DAYS OF APPROVAL OF PERMIT REVISION N0. 1, THE APPLICANT SHALL <br />SUBMIT TO THE DIVISION THE FOLLOWING DEMONSTRATIONS FOR THE SMALL AREA <br />EXEMPTIONS WITHIN THE PERMIT AREA: 1) A DEMONSTRATION THAT SEDIMENT PONDS <br />OR TREATMENT FACILITIES ARE NOT NECESSARY FOR DRAINAGE FROM THE AREA TO <br />MEET EFFLUENT LIMITATIONS, AND 2) A DEMONSTRATION THAT THE AREA IS SMALL <br />AND THAT THERE IS NO MIXTURE OF SURFACE DRAINAGE WITH MINE WATER <br />DISCHARGE. <br />Stipulation No. 17 <br />WITHIN 120 DAYS OF PERMIT REVISION APPROVAL, THE APPLICANT SHALL SUBMIT <br />DESIGNS FOR THE MAGPIE CREEK CHANNEL IN COMPLIANCE WITH THE REQUIREMENTS <br />OF RULE 4.05.4. THE DESIGNS SHALL INCLUDE PLAN VIEWS, LONGITUDINAL <br />PROFILE, CROSS-SECTIONS AND CHANNEL PROTECTION DETAILS IN ORDER TO MEET <br />THE REQUIREMENTS OF RULE 4.05.4(4). <br />-3- <br />