Laserfiche WebLink
<br />~II ~I~II~~I~~~~~ ~I~ <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver. CO 80203 <br />303 8663567 <br />FA X: 303 832-8106 <br />tovember 23, 1990 <br />Mr. Brent Ducray <br />Mountain Region Corporation <br />174 31 Road <br />Grand Junction, CO 81503 <br />Re: Invoice, Hawk's Nest Mine Reclamation Project, Purchase Order <br />No. C-54968, Bid No. RN-GOAL-MINES-4 <br />Dear Mr. Ducray: <br />OF ~afp <br />.~`~ -~ qy <br />r -:6.1°0 <br />H <br />^ o <br />'~C' ~ ~~~ <br />` /876 <br />Roy Romer, <br />Governor <br />Fretl R. Banta. <br />Division Dvector <br />The Division has received your first invoice for work being performed at the <br />Hawk's Nest Mine. I performed an inspection of the site on November 19, 1990 <br />in order to determine if required work on each of the bid items listed on the <br />invoice had been completed in accordance with specifications. The results of <br />the inspection are as follows: <br />1. Mobilization/Demobilization - 75% of bid amount accepted for payment <br />($4,725.00). <br />2. Substation Facilities - 100% of bid amount accepted for payment <br />($2,000.00). <br />Switch Gear Building - 100% of bid amount accepted for payment <br />(51,400.00). <br />Crusher Facility - Only about 50-75% of the steel portion of the <br />structure has been removed, and this portion has only been stockpiled on <br />the other side of the highway. None of the foundations have been <br />removed. As such, the Division can only approve 40% of the bid amount <br />for payment at this time ($1,040.00). <br />Steel Fuel Tank = None of the work on removing this structure and <br />disposing of it off site has been completed, therefore the Division <br />cannot approve payment at this time. <br />Miscellaneous Steel Tank - 100% of bid amount accepted for payment <br />($2,700.00). <br />Pump House Building - 100% of bid amount accepted for payment ($1,700.00). <br />River Pumping Facility - Only the wood shack and pump have been removed. <br />The vertical CMP housing is still in place. The Division can approve <br />payment of 40% of the bid amount at this time ($240.00). <br />Warehouse Building #2 - Although all of the above grade portions of this <br />structure have been removed, the concrete pad and footers still remain in <br />place. As such, the Division can approve only 75% of the bid amount for <br />payment at this time ($1,575.00). <br />