Laserfiche WebLink
-5 - <br />Division's estimate and the estimate prepared by Salt Creek I+lining Company <br />appear to result primarily from differences in backfill volumes, structural <br />demolition costs, and the inclusion of indirect costs (overhead and profit) <br />and bid specification preparation costs in the estimate. The mine bench area <br />and haul road cross sections prepared by the Division (attached to the <br />Division's estimate) should be reviewed in detail to determine if the <br />resulting backfill volumes are accurate. Once the differences in the <br />estimates have been resolved, Table 3.7-1 of the application will need to be <br />revised accordingly. <br />/i ml <br />6645E <br />