Laserfiche WebLink
<br />-4- <br />Stipulation No. 5: Additional analysis of fill material. <br />Status: Adequate response received September 3, 1985. Stipulation <br />resolved. <br />Stipulation No. 7: Commitment to utilize combined Munger and McClane Canyon <br />pre-mie ng vegetation productivity data for determination of revegetation <br />success. <br />Status: Adequate response received September 3, 1985. Stipulation <br />resolved. <br />Stipulation No. 8: Commitment to provide woody plant density revegetation <br />success Stan ar . <br />Status: Adequate response received September 3, 1985. Stipulation <br />resolved. <br />Stipulation No. 9: Commitment to provide species diversity revegetation <br />success Stan ar . <br />Status: Adequate response received September 3, 1985. Stipulation <br />resolved. <br />Stipulation No 10: Commitment to include the Munger Canyon Mine revegetation <br />mom Loring p an in the McClane Canyon Mine reclamation plan. <br />Status: Adequate response received September 3, 1985. Stipulation <br />resolved. <br />Stipulation No. 11: Revise backfilling scheme for the McClane Canyon Mine <br />Aorta enc area. <br />Status: Adequate response received September 3, 1985. BLM concurrence <br />received February 26, 1986. Stipulation resolved. <br />Summary of Stipulation Status <br />Resolved: 5, 1, 8, 9, 10, 11. <br />Unresolved (with future deadline): None <br />Ongoing: 1, 2, 3, 4, 6. <br />Unresolved (delinouent): Plone <br />V. BONDING <br />Estimated reclamation costs for the McClane Canyon Mine have been recalculated <br />by the Division. Please refer to the enclosed cost estimate for a detailed <br />breakdown of estimated costs. This estimate is preliminary in nature and needs <br />to be reviewed in detail by Salt Creek Mine Company to determine whether the <br />material quantities and task items accurately reflect site conditions and the <br />requirements of the approved permit. Major areas of difference between the <br />