My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42563
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:19 PM
Creation date
11/23/2007 11:51:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
General Documents
Doc Date
12/27/1984
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_2_ . <br /> <br />Mid-Term Review <br />Hayden Gulch Mine - Permit No. C-003-80 <br />Introduction <br />This document presents the results of the Division's mid-term review of the <br />H-G Coal Company's Hayden Gulch Mine. This mid-term review was conducted to <br />fulfill the requirements of Rules 2.08.3, 2.06.2(9), 2.06.3(4), 2.06.5(3), <br />2.06.7(5) and 3.02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued, <br />prior to its mid-term. Based on this review, for good cause shown, the <br />Division may require reasonable revision or modification of the permit <br />provisions to ensure compliance with the Act and Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.1 require that experimental practices, <br />mountaintop removal variances, variances from AUC, and variances from <br />contemporaneous reclamation be reviewed by the Division where applicable. The <br />Hayden Gulch permit does not have any operations under these categories. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and <br />the terms of acceptance of the bond every 2 1/2 years. <br />The mid-term review consisted of a detailed review of the Hayden Gulch <br />findings document, permit revision findings document, and permit application <br />to identify any items that may have been overlooked during the initial <br />review. The Division also reviewed all subsequent revisions and stipulation <br />responses to ensure that all permit commitments and conditions were being <br />followed. Hydrologic monitoring data was reviewed in conjunction with the <br />review of the application to assess the adequacy of the monitoring plan and <br />discussion of hydrologic impacts. Finally, the Division conducted an on-site <br />inspection of the mine in addition to a detailed review of past inspection <br />reports to ensure consistency of the mine plan with field conditions and to <br />identify any potential on-the-ground problems requiring attention. <br />This document is organized as follows: Section I includes a summary of our <br />decision to require revisions with regard to the mid-term review required <br />under Rule 2.08.3. Section fA includes a listing by category of what items <br />need to be revised, a rationale for requiring these revisions, and timetables <br />for completing these revisions. Section IB presents a summary of the status <br />of the stipulations attached to the Hayden Gulch Permit C-003-80 and any <br />revisions required with regard to the stipulations. Section IC sumnarizes the <br />revisions to the permit processed to date and the action taken by the <br />Division. Finally, Section !I presents the results of the bond review <br />required under Rule 3.02.2(4). <br />
The URL can be used to link to this page
Your browser does not support the video tag.