Laserfiche WebLink
Mr. Greg Squire <br />September 30, 1987 <br />Page 3 <br />Compliance Material for Stipulation No. 5 <br />- Revised Exhibit No. 18 - Drainage and Sediment Control Plan <br />- Revised Map 26 - Drainage and Sediment Control Plan <br />- Revised page 2.05.6-2Rb <br />Stipulation No. 6 <br />The operator shall commence reclamation of the Williams Fork Strip Pit No. <br />2 site no later than one year following approval of this permit <br />application. If by that date a revision to the existing plan has not been <br />approved, the operator shall complete the reclamation as currently <br />approved. <br />liance Material for Stipulation No. 6 <br />- Reclamation activities for the Williams Fork Strip Pit No. 2 <br />were initiated August 12, 1987. Backfilling/grading, topsoil <br />redistribution and revegetation operations were completed as of <br />September 26, 1987. Mulching and contour furrow construction <br />operations are scheduled to be completed no later than the 15th <br />of October, 1987. <br />If you have any questions concerning these issues, please call me. <br />Sincerely, <br />~ L~'~i+~u~~ <br />D. Larry D u <br />DLD/js <br />enclosures <br />