Laserfiche WebLink
Mr. Gregg Squire <br />September 30, 1987 <br />Page 2 <br />chemical constituents of the water as a result of the presence <br />of suspended material. Such samples will be filtered thru a <br />0.45 micron membrane filter prior to preservation of the sample, <br />and only the filtrate will be chemically analyzed. Ground water <br />samples intended to be analvzed for biochemical oxvaen demand or <br />The plan will be provided in such form that it can be incorporated into <br />the permit application as an exhibit. Appropriate revisions in related <br />text, tables, figures, and maps of the permit application will be made, <br />dated copies of this revised material will also be provided for insertion <br />into the copies of the permit application on file with the Division. <br />Compliance Material for Stipulation No. 1 <br />- Revised Table 3 pages 2.04.5-6R through 2.04.5-8R <br />- Revised Exhibit No. 29, Water Quality Monitoring Manual <br />Stipulation No. 2 <br />The Division directs Empire Energy Corporation, within 90 days of permit <br />issuance, to submit to the Division the results of the sampling program <br />for all overburden proposed to be used for plant growth media. <br />Based upon the results of these studies, and the utilization of any <br />proposed soil amendments, the applicant shall demonstrate to the <br />Division's satisfaction that the proposed overburden is an acceptable <br />plant growth media. <br />Compliance Material for Stipulation No. 2. <br />- Exhibit No. 41 - Overburden Analysis - Number 5A Portal Area; <br />Volume 10, Permit C-81-044 <br />Stipulation No. 5 <br />Within 90 days of permit issuance the operator will submit an updated <br />version of Map 26 and Exhibit 18 showing the existing drainage and <br />sediment control plan presently on site. This map must also include any <br />small area exemptions granted. Exhibit 18 must also be updated to reflect <br />any revisions to the permit and existing on-site conditions. <br />