'~ <br />", •`f'. <br />Ms. Carol Russell <br />October 28, 1981 <br />Page 2 <br />Proposed <br />Reclamation Activities <br />Backfilling the Pit <br />Construct Clay Zone <br />Final Grading <br />Redistribution of Topsoil <br />Seeding/Revegetation <br />8ackfill Diversion Ditches <br />Final Grading <br />Redistribution of Topsoil <br />Seeding/Revegetation <br />,~ <br />i,i it <br />i~It~~J <br />• <br />Approximate <br />Time Frame <br />December 31, 1981 <br />January 31, 1982 <br />February 15, 1982 <br />March 15, 1982 <br />.x- <br />May 1, 1982 <br />July 31, 1982 <br />August 31, 1982 <br />September 30, 1982 <br />October 30, 19P,2* <br />*The planned seeding dates were recommended by Mr. David S. <br />Patch, GEC's Vegetation Consultant. <br />MAGPIE CREEK DIVERSION C1iANNEL <br />- The existing Magpie Creek Diversion Channel within GEC's boundary <br />was constructed based on the 10-year 24-hour storm event. However, <br />a recent report (under the SOAP Program) generated by Simons, Li & <br />Associates, Inc., indicates that the Magpie Creek Diversion channel <br />within Dorchester's permit boundary is a permanent diversion. <br />Therefore, the portion within GEC's permit boundary is reasonable <br />to design as permanent diversion. The channel is designed to contain <br />the 10-year, 24-hour storm event. The flood plain should be able <br />to handle the 100-year peak discharge. In order to convert the <br />existing channel bed and side slopes tc the dimension recommended <br />by SLA, a considerable amount of work and effort will have to be put <br />into GEC's operational schedule, The lining material such as the <br />Filter Fabric also takes a long time tc order. Besides this, <br />Dorchester - GEC's next door neighbor operator, still uses this <br />area (within GEC Permit Boundary) to ertend it's pipe extension <br />work, which interferes with GEC reclamation work even at this <br />moment. Because of this, GEC is herewithin requesting that the <br />deadline to completely reconstruct Magpie Creek Channel within GEC's <br />permit boundary be postponed from November 15, 1981, to December <br />31, 1981. <br />UNNAMED DIVERSION CHANNEL (Dam D Area) <br />- Same as Magpie Creek Diversion Channel. After the completion of <br />this specific channel SLA suggested this channel be converted to <br />a permanent diversion just because Dorchester intends to design <br />Magpie Creek Diversion Channel on a permanent basis. The amount <br />of reconstruction work and effort that will be required is signifi- <br />cant, therefore, GEC is herewithin requesting that the deadline <br />of re-establishment of the channel be changed to December 31, 1981. <br />