Laserfiche WebLink
~1 <br />1 <br /> <br />1 <br />1 <br /> <br />Suburban Sand <br />Hours change <br />Narch 6, 1992 <br />and Gravel. Co <br />request <br />Page 6 <br />The noise from the trucks could be a problem. The extended <br />haul hours will mean the average number of trucks leaving the pit <br />per hour can be reduced. The late night hauling will increase the <br />efficiency and reduce the actual number of truck units needed <br />because there will be less traffic on the roads. It will also <br />reduce the number of trucks on the road during peak traffic hours <br />in the morning and afternoon. The extended hauling hours would <br />run concurrent with the extended production hours and all late <br />night hauling would end no later than September 1, 1992. <br />we have discussed the problems associated with this short <br />time use above. We feel the economic benefits to Adams County <br />should also be taken into account as well. Not only will the <br />Airport benefit from the material but Adams County stands to gain <br />the taxes on the removed material, benefits from the increased <br />payroll for county citizens who drive the trucks and process the <br />gravel, a share of the 3.88 state tax collected on $5,000,000 <br />worth of gravel and the road tax collected on the trucks using the <br />' roads. In addition Adams county stands to collect tax dollars <br />from services and products needed at the pit while this increased <br />production is going on, that may not have been needed if produc- <br />t tion were less. Adams County has all ready collected the sale tax <br />money on $2,000,000 worth of heavy equipment Aggregates, Inc. <br />purchased from county firms this year. <br />1 <br /> <br /> <br /> <br /> <br />5. ITS EFFECT ON THE FOTORS DEVELOPMENT OF THS AREA. <br />Eventually the area west of Brighton Road will be developed <br />for various forms of open space and recreation. There is a finite <br />supply of gravel in this pit and the faster it is removed the <br />shorter the time before the final land use will be realized. The <br />increased production will actually reduce the life expectancy of <br />this pit. During a normal year 600,000 tons of material is mined <br />and sold at the pit. By mining 1.356 million tons by September <br />1st we will have removed a 2.26 years supply during this year <br />alone, which will result in almost a 208 reduction in the life of <br />the pit. <br />' 6. <br /> <br />1 <br />The present character of Brighton Road indicates the frontage <br />along the east will eventually develop as commercial and in- <br />dustrial with buffers of multi-family residential leading to <br />single-family dwellings. Again, this is far enough in the future <br />that this very limited use will not exist at that time. <br />ITS AFFECT ON THE HEALTH, SAFETY AND WELFARE OF THE INHABITANTS OF <br />THE AREA AND THE CODNTY. <br />we are acutely aware of our neighbors in the area and operate <br />this facility in strict compliance with all County, State and <br />Federal laws regarding air and water pollution as well as other <br />health and safety standards, we want to be good neighbors. we <br />also believe that the when the majority of Adams County citizens <br /> <br />