Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Suburban Sand and Gravel <br />Mining Plan Change <br />March 6, 1992 <br />RECLAMATION COSTS (revised 1/92) <br />COSTS <br />Page 14 <br />S}CHIBIT L (coat) <br />1. Grass seed cost, 50.00 ac @ $13 .42/ac $ 669.50 <br />2. Fertilizer cost, 50.00 ac @ $15.70/ac 785.00 <br />3. General labor, 50.00 ac ± @ $104/ac 5,200.00 <br />4. Straw Mulch, 50.00 ac. @ $93.00/ac 4,650.00 <br />5. Seed mixture drilling, fertilizing, and <br />mulching 50.00 ac @ $50.00/acre 2,500.00 <br />6. Resoiling, H ul distance - less than 500' <br />36,542 yd~ x $0.70/yd3 25,579.40 <br />7. Grading and shaping, 10.00 ac. @ $210.00/ac. 2,100.00 <br />Net Total $ 41,483.90 <br />ML RS INDIRECT COSTS @ 15.808 6,554.46 <br />TOTAL ESTIMATE $ 48,038.36 <br />RECOMMBND BOND BB SST AT $48,000.00 <br />• Figures from MLRB Doc. 1457 effective 2/83 <br />838 efficiency, 641-B scraper, NE location <br />