My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-12-10_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
1997-12-10_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 5:10:55 PM
Creation date
11/23/2007 11:32:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
12/10/1997
Doc Name
Proposed Decision & Findings of Compliance for PR2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1994. Stipulation 14 was attached to Technical Revision No. 21, issued March 6, 1995. Stipulation No. 15 <br /> was attached to the Division's September 23, 1997, permit transfer approval decision. <br /> Stipulation No. 1 required submittal of detailed refuse disposal specifications for the North Portal decline area <br /> prior to initiation of reclamation in that area. Due to reclamation plan changes set forth in PR-02, refuse <br /> disposal is no longer proposed in that location, and the Stipulation is terminated. <br /> Stipulation No.2 requires submittal of an annual hydrology report and outlines the information to be included <br /> in the report. The stipulation is still active. <br /> Stipulation No.6 related to field trials conducted on the Roadside Refuse Pile,conducted to demonstrate that <br /> successful revegetation could be established on refuse disposal areas at the mine, with less than four feet of <br /> non-toxic cover soil. The field trials have been completed, and reduced cover depths were approved by the <br /> Division in 1994. The stipulation has been terminated. <br /> Stipulation No.7 specifies an additional performance bond amount which must be filed prior to construction <br /> of Cameo Refuse Disposal Area No. 3 (CRDA-3). The required bond amount associated with CRDA-3 was <br /> increased from $672,529.00 to$800,871.00 as a result of reclamation cost estimate associated with PR-02. <br /> The stipulation as modified for PR-02, is still active. <br /> Stipulation No. 11 was attached to the RN-02 approval,and required that the operator submit proof that four <br /> AML violations and one State of Kentucky violation were appealed, and if appealed, that proof of final <br /> resolution be submitted to the Division. AVS checks associated with PR-02 revealed that these matters had <br /> been resolved. As a result of a permit transfer approved in September, 1997, Peabody Coal Company is no <br /> longer affiliated with Powderhom Coal Company. The stipulation is terminated. <br /> Stipulation No. 12 was attached to the RN-02 approval, and required submittal of an initial surface visual <br /> inspection for areas to be undermined in the 5 year permit tern,documenting any surface structures or features <br /> to be undermined. In addition, the stipulation required the operator to conduct semi-annual subsidence <br /> inspections and to prepare and submit an annual subsidence report by December 31 of each year. The initial <br /> inspection was conducted and report submitted as required, and the operator has committed to semi-annual <br /> visual monitoring inspection and annual report submittal within the permit application text(Section 2.05.6(c), <br /> Tab-20, Vol. 6). The stipulation is therefore terminated. <br /> Stipulation No. 13 was attached to MR-23, approved August 29, 1994. The stipulation related to various <br /> Peabody Coal Company violations revealed by AVS system check. Review associated with PR-02 indicated <br /> that the violations had been resolved. As a result of a permit transfer approved in September, 1997, Peabody <br /> Coal Company is no longer affiliated with Powderhor Coal Company, and the stipulation is terminated. <br /> Stipulation No. 14 was attached to Technical Revision No. 21, issued March 6, 1995. The stipulation <br /> required submittal of an air emission permit prior to construction of the North Portal coal handling facilities <br /> addressed in the revision. A copy of the emission permit dated June 27, 1995 was submitted to the Division, <br /> and is included in Appendix 16-1 of the permit application. The stipulation is therefore terminated. <br /> Stipulation No. 15 was attached to the September, 1997 permit transfer. The stipulation required proof of <br /> resolution of certain Kentucky and West Virginia violations listed in the AVS system at the time of issuance <br /> of the transfer decision. Based on an AVS system check of November 18, 1997, documentation of final <br /> resolution has not yet been provided, and the stipulation, as modified for PR-02, is still active. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.