Laserfiche WebLink
Stipulation'No:` 23 was attached, to the <br />Applicant Violator System "conditional <br />requires the operator to provide proof <br />associated with Quaker Coal controlled <br />West Virginia. To date, the operator <br />resolution, and the stipulation remains <br />issue" recommendation. '-'Tt <br />of resolution of violations <br />operations in Virginia 'and <br />has not provided proof of <br />in effect. <br />Revisions <br />The following revisions were submitted by the operator subsequent <br />to issuance of the Renewal 03 proposed decision. <br />Technical Revisions <br />TR-32 was deemed complete on June 13, 2000. The revision was <br />submitted in response to a DMG revision order, and addresses <br />various reclamation plan changes necessitated by earlier than <br />anticipated cessation of mining. Proposed changes include final <br />refuse pile designs, Coal Creek permanent diversion modifications, <br />and post-grading sediment controls. The revision is still under <br />review. <br />TR-33 was deemed complete July 12, 2000. The revision addresses a <br />proposed permanent minewater discharge system for the South Portal <br />mine. The operator's proposal would utilize a combination of the <br />existing 6 inch siphon through the sealed Northwest Intake to <br />Discharge Point 002; with an existing de-watering pipe from a sump <br />at the upper end of the workings, extending through the main South <br />Portal seals, to Discharge Point 001. The revision is still under <br />review. <br />Minor Revisions <br />MR-041 approval decision was issued March 21, 2000. The revision <br />provided an interim de-watering plan for the Roadside South Mine <br />workings. <br />MR-092 approval decision was issued April 3, 2000. The revision <br />provided updated affected and disturbed area acreages for the <br />Roadside North and South Portals Mine. <br />MR-043 approval decision was issued April 28, 2000. The revision <br />allowed for use of a small pre-law overburden pile as a borrow area <br />for use in backfilling the South Fan Shaft. <br />MR-044 approval decision was issued June 5, 2000. The revision <br />modified the approved "shadscale components" seedmix, specifically <br />for the 2-West Portals and South Fan reclamation, due to seed <br />5 <br /> <br />