Laserfiche WebLink
V _ • f7- • <br />~~~ <br />~ order to allow fur an appropriate deyree of consolidation settlement. <br />~~ This will be particularly important in those areas where existing <br />drainages are to be reconstructed acrnss the highwall boundary. <br />The followiny stipulation is therefore necessary. <br />Stipulation No. 1 <br />PENBUDY COAL COIIPNIJY IS UIRECTEU TU RNIJUALLY tdUNlTUR THE <br />PUSi-MINIIJG TUPOGRAI'HY OF BACKFlI_LEU AIJD KEGRIIUED SURFACES OF <br />TtIE OISTUKBEU AREA. I•tUNITURING FUR PHIS PURPUSL SHItLL CONSIST <br />OF A CUNTUUK 14AP (CUIJTOUR INTERVAL NUT TU EXCEEU 5 FEET) <br />PKODUCEU FKUM AN r11JIJUAL SUKVEY UTILIZING F1ELU OR <br />AEKUPHUTUGRArgIgETK1C IECNIV]t1UES ACCEPTr18LE TU THE DIVISION. THE <br />PUST-1~1IIJItJG TUPUGRAPIiIC !-TAPS SWILL BE SUBF1iTTEU TU THE DI4ISIUIJ <br />FUN REVIEW ANU APPROVAL UN AIJ AWWIINL BA51S. THE FIRST SUBf°11TTAL <br />IS UUE JAPJUARY, 19134. <br />XXI. Bonding - kule 2.05.4(2)(b) and Rule 3 <br />Peabody Coal Company has agreed to post a performance bond in the amount <br />of six Iw ndred eiyfity two thousand and seventy-two dollars <br />($682,U72.UU). The Division has determined that this amount will be <br />sufficient to cover the cost of reclamation at the Pb~cla Kline during the <br />worst case time period during the five year permit teen. <br />Purusant to mule 2.U7.b(2)(j) and 3.UZ.1(1), the performance bond in this <br />amount will be filed with the Division, payable to the State of Colorado, <br />beFure the permit will ue issued. <br />XXII. Sealin of Drilled Holes and Underground Openings - Rules <br />2.U5.4L g and 4.07 <br />Adequate information descriuing ttre sealing of drilled holes and <br />underground openings is found in Tao. 12, Volume 4. <br />XXIIl. I•liscellaneous Compliance -Rules 2.05.b(5), 4.02, 4.12, 4.19, <br />No problems were identified with .respect to the reVuire~nents of this <br />section concerning signs and markers, surface coal ~nininy adjacent to <br />underground workings, slides, facilities not at or near the mine site, <br />etc. <br />XXI V. Operations on Lands Subject to Limitations ur Prohibitions - <br />The Division finds that the permit area of the proposed operation is not <br />within: <br />