My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41728
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:03 PM
Creation date
11/23/2007 11:22:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
12/15/1992
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR2
From
Add Southwest Mining District
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Warehse #2 1.5 acres veg., rock filter i <br />Tipple #2 <1 acre rock filter/vegetation <br />Stoker loadout 1.8 acres silt fence/rock filter <br />• Pond D .7 acre veg/rock filter/sump <br />Pond D west .5 acre rock filter <br />Pond T pile .5 acre rock filter <br />Overland belt .5 acre rock filter <br />FC Tipple <5 acres sump, rock filter <br />For additional specifics on the currently approved Small Area <br />Exemptions see pages 2.05-28 to 2.05-28 (c) of Vol. I <br />(4 .05.2 (3)(b)(i)). <br />8. Surface and Ground Water Monitoring - 2.05.6(3)(b)(iv) <br />1. The applicant will conduct monitoring of ground water in a <br />manner approved by the Division. The ground water monitoring <br />plan can be found in Exhibit 14, Vol. II of the permit document <br />(4.05.13(1)). <br />2. The applicant will conduct monitoring of surface water in a <br />manner approved by the Division. The surface water monitoring <br />plan can be found in Exhibit 14, Vol. II of the permit <br />document. NPDES monitoring is conducted under many permits for <br />the Foidel Creek mine as per the following: <br />POND OUTFACE SITE NPDES PERMIT # <br />++++++++++++++++++++++++++++++++++++++++++++++++++++++ <br />E 001 62 CO-0036684 <br />TREAT 001 115 CO-0042161 <br />S 003 63 CO-0027154 <br />C 004 82 " <br />E 006 85 " <br />G 008 55 " <br />T 002 80 <br />The Division has reviewed the surface and groundwater monitoring <br />plans as part of the revision process. These monitoring plans are <br />adequate to allow identification of impacts if any should develop <br />(4.05.13(2)). <br />IV. Topsoil <br />Replaced stockpiled soils will be chisel plowed in addition to contour <br />furrowed. These voila will be drill seeded as soon as practicable <br />following topsoil replacement. <br />1. Alternative treatments to eliminate slippage surfaces, relieve <br />compaction, and provide for root penetration are proposed to be <br />approved. This treatment will consist of chisel plowing <br />(4.06.4(1)). <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.