Laserfiche WebLink
GEC/Fast Fit Coal Reclamation Project February 15, 1994 <br />RN-MINDS-322 <br />REVISID BID SCHIDULE <br /> Unit <br />Item Descri~on Qyt Unit Price Amount <br />1 Mobilization and demobilization 1 Job N/A $54.000.00 <br />2 Chen's Hill Reduction 1 Job N/A $100,729.00 <br />3 Chen's Hill Drainage Control <br /> a) With riprap 100 I.n Ft $10_00 $1.000.00 <br /> b) Without riprap 1300 Ln Ft $4.25 $5.525.00 <br />4 Chen's Hill Topsoil Replacement 1 Job N/A $10.000.00 <br />5 West Slope Reduction 1 Job N/A $2.369.00 <br /> DELETED <br />7 West Slope Topsoil Replacement 1 Job N/A $4,033.00 <br />8 North End Bacldill and Grading 1 Job N/A $20.348.00 <br />9 North End Topsoil Replacement 1 Job N/A $6.453.00 <br />IO East Pit Bacid"ill from West to Fast 1 Job N/A $50.000.00 <br />11 East Pit Slope Reduction from East to West 1 Job N/A $50.000.00 <br />12 East Fit Channel Reconstruction <br /> a) With erosion mat 100 Ln Ft $15_00 $1 500.00 <br /> b) With erosion mat & riprap 250 Ln Ft $20_00 $5.000.00 <br /> c) Without erosion mat 2200 Ln Ft $0.30 $660.00 <br /> d) Drop $truCtures 15 Each $1600.00 $24.000.00 <br />13 Fast Fit Topsoil Replacement 1 Job N/A $S 000.00 <br />14 Revegetation <br /> a) Fertilizer 75 Acres $43_00 $3.225.00 <br /> b) Seeding 75 Acres $5_00 $375.00 <br /> c) Mulching and crimping 10 Arms $200.00 $2.000.00 <br />15 CAT D-8L Bulldozer, with operator, <br /> or Equivalent. Offering 335 FHP 16 Hours $90_00 $1.440.00 <br />16 CAT 621 E Scraper, with operator, 16 Hours $162.22 $2.595.52 <br /> or equivalent. Offering 450 FHP <br /> GRAND TOTAL $350.252.52 <br />m.< <:~oysi~4„roECrown.~c <br />Page 1 of l Page <br />