My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41648
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:00 PM
Creation date
11/23/2007 11:19:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
General Documents
Doc Date
3/17/1987
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ~- <br />_ STIPULATION N0. 13 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT DESIGNS FOR <br />DITCHES F1, F2 AND F3 AND THE TWO 24 INCH CULVERTS ASSOCIATED WITH DITCH F2. <br />Status: Resolved (December 20, 1984). CYCC submitted the appropriate <br />information. <br />STIPULATION N0. 14 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE SHALL INCORPORATE INTO THE <br />PERMIT DOCUMENT A DISCUSSION OF THE EXISTING STOCK WATERING POND. (THIS <br />DISCUSSION SHOULD INCLUDE THE SIZE OF THE POND, DESIGN AND CONSTRUCTION DATA, <br />CONSTRUCTION DATE). <br />Status: Resolved (December 20, 1984). The requested discussion was <br />submitted by CYCC. <br />STIPULATION N0. 15 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE SHALL PROVIDE THE DIVISION, TO <br />BE INCORPORATED INTO THE PERMIT DOCUMENT, A PLAN FOR CONTROLLING SEDIMENT FROM <br />THE DISTURBED AREA ABOVE THE HOMESTEAD IRRIGATION DITCH. <br />Status: Resolved (December 20, 1984). CYCC submitted a discussion of the <br />area to be reclaimed above the Homestead Ditch. Technical Revision <br />No. 1 replaced the initial plan to place straw bales with placement <br />of a silt fence above the ditch for sediment control. <br />STIPULATION N0. 16 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE COLORADO YAMPA COAL COMPANY SHALL PROVIDE <br />DOCUMENTATION OF THE ROUTT COUNTY COMMISSIONER'S DECISION REGARDING THE <br />PERMANENT RELOCATION OF COUNTY ROAD 179, OR PROVIDE A RECLAMATION PLAN FOR THE <br />ROAD. <br />Status: Resolved (February 18, 1985). CYCC submitted the appropriate <br />documentation. <br />The operation is in compliance with all stipulations. <br />VI. Bonding <br />The Division has reviewed the reclamation performance bond for the CYCC Mine <br />No. 3 in accordance with Rule 3.02.2(4). The current performance bond for the <br />CYCC Mine No. 3 Mine is 53,732,700. The Division feels that this bond amount <br />is sufficient to complete all necessary reclamation work at Mine #3. <br />/sak <br />8192E <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.