My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41648
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:00 PM
Creation date
11/23/2007 11:19:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
General Documents
Doc Date
3/17/1987
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_ ACCORDING TO THE SAME SCHEDULE. THIS MONITORING SITE MUST BE LOCATED UPSTREAM <br />NEAR THE WESTERN PERMIT BOUNDARY AND MAP 4A MUST BE REVISED WITHIN 30 DAYS OF <br />PERMIT ISSUANCE TO SHOW THE LOCATION. THE MONITORING INFORMATION FROM FOIDEL <br />CREEK SHALL BE INCLUDED IN THE PERMITTEE'S ANNUAL HYDROLOGIC MONITORING REPORT <br />TO THE DIVISION. <br />Status: Resolved (December 12, 1984) CYCC committed to monitor Foidel Creek <br />water quality at site 60. Site 60 was removed from the water <br />monitoring plan by TR-02. <br />STIPULATION N0. 4 <br />INSTANTANEOUS STREAMFLOW MEASUREMENTS SHALL BE OBTAINED AND RECORDED BY THE <br />PERMITTEE AT THE SAME TIME THAT WATER QUALITY SAMPLES ARE COLLECTED AT SITE 29 <br />ON MIDDLE CREEK AT A MINIMUM DURING THE MONTHS FROM JUNE THROUGH OCTOBER. <br />THESE FLOW MEASUREMENTS SHALL BE INCLUDED IN THE PERMITTEE'S ANNUAL HYDROLOGIC <br />MONITORING REPORT. <br />Status: Ongoing. <br />STIPULATION N0. 5 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST AMEND THE RECLAMATION <br />TIMETABLE UNDER RULE 2.05.4 OF THE PERMIT APPLICATION TO INCLUDE RECLAMATION <br />AND RESTORATION OF THE DISTURBED AREA ASSOCIATED WITH THE MIDDLE CREEK MINE <br />OFFICE COMPLEX. <br />Status: Resolved (March 19, 1985). <br />STIPULATION N0. 6 <br />THE PERMITTEE SHALL SUBMIT THE DESIGN FOR THE HAUL ROAD DRAINAGE DITCHES AS A <br />TECHNICAL REVISION TO THE DIVISION FOR APPROVAL PRIOR TO CONSTRUCTION. <br />Status: Resolved (September 16, 1986) CYCC submitted drainage ditch designs <br />as part of Technical Revision No. 1, revised Sediment Control Plan. <br />STIPULATION N0. 7 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE MUST SUBMIT DESIGNS FOR THE <br />MIDDLE CREEK DETENTION BASIN ADEQUATE TO CONTAIN THE FLOWS FROM THE 10 YEAR - <br />24 HOUR STORM IN CONFORMANCE WITH RULE 4.05.6. APPROVAL OF THE DESIGN MUST BE <br />OBTAINED PRIOR TO CONSTRUCTION. <br />Status: Resolved (December 20, 1984). CYCC submitted designs for the Middle <br />Creek Detention Basin. <br />STIPULATION N0. 8 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE COLORADO YAMPA COAL COMPANY MUST SUBMIT TO <br />THE DIVISION, TO BE INCORPORATED INTO THE PERMIT APPLICATION, A PLAN FOR <br />DEWATERING THE DETENTION BASINS TO THE ELEVATION NECESSARY TO CONTAIN THE 10 <br />YEAR - 24 HOUR STORM. THIS PLAN SHOULD INCLUDE THE RUNOFF CALCULATIONS FOR <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.