Laserfiche WebLink
5. Upon completion of the first lift during fill operations;. <br />6. Upon completion of topsoil application; <br />7. Upon completion of the first furrow and track hoe gouges; <br />8. Upon initiation of revegetation operations. <br />ADDITIONAL BID ITEMS <br />There are included on the Bid Schedule, several additional bid items. These bid items are not <br />guaranteed, and will be used only in the event that funds allow, and only after approved by the <br />PROJECT MANAGER. The additional bid items for this project include: <br />Task 6: Scrap Removal <br />A large volume of metallic scrap is located to the west of the mine entry. Please provide a price to <br />remove all of the metallic scrap from the area designated by PROJECT MANAGER. The scrap <br />material may be removed from the site by the CONTRACTOR for salvage value, or it may be <br />buried at the base of designated coal refuse fill area after all topsoil has been salvaged and <br />removed from the disposal area. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 6 on the Bid Schedule. This lump sum bid will cover all costs for the removal of all <br />metallic scrap from the area designated by PROJECT MANAGER. Payment shall be as this task <br />is completed and approved by the PROJECT MANAGER. Such payment shall be considered full <br />compensation for all labor, materials, equipment and all other items necessary and incidental to <br />the completion of Task 6. <br />