My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41635
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:59 PM
Creation date
11/23/2007 11:18:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981046
IBM Index Class Name
General Documents
Doc Date
6/14/1999
Doc Name
DOCUMENTED QUOTE SUNLIGHT COAL MINE RECLAMATION PROJECT PKA-0-1071
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Upon completion of the first lift during fill operations;. <br />6. Upon completion of topsoil application; <br />7. Upon completion of the first furrow and track hoe gouges; <br />8. Upon initiation of revegetation operations. <br />ADDITIONAL BID ITEMS <br />There are included on the Bid Schedule, several additional bid items. These bid items are not <br />guaranteed, and will be used only in the event that funds allow, and only after approved by the <br />PROJECT MANAGER. The additional bid items for this project include: <br />Task 6: Scrap Removal <br />A large volume of metallic scrap is located to the west of the mine entry. Please provide a price to <br />remove all of the metallic scrap from the area designated by PROJECT MANAGER. The scrap <br />material may be removed from the site by the CONTRACTOR for salvage value, or it may be <br />buried at the base of designated coal refuse fill area after all topsoil has been salvaged and <br />removed from the disposal area. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 6 on the Bid Schedule. This lump sum bid will cover all costs for the removal of all <br />metallic scrap from the area designated by PROJECT MANAGER. Payment shall be as this task <br />is completed and approved by the PROJECT MANAGER. Such payment shall be considered full <br />compensation for all labor, materials, equipment and all other items necessary and incidental to <br />the completion of Task 6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.