My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41635
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:59 PM
Creation date
11/23/2007 11:18:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981046
IBM Index Class Name
General Documents
Doc Date
6/14/1999
Doc Name
DOCUMENTED QUOTE SUNLIGHT COAL MINE RECLAMATION PROJECT PKA-0-1071
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revegetation of All Areas <br />The CONTRACTOR will supply the fertilizer (commercial), mulch, and equipment for chiseling, <br />fertilizer application, seeding, mulching and crimping. Revegetation efforts will occur on <br />approximately four (4) acres, which includes the coal mine waste disposal area, the cut and fill <br />slopes, adjacent anticipated disturbances and access roads to each <br />Owner will provide the seed. Seed application rate is specified on Table 1, attached. <br />Measurement and Payment <br />Measurement and payment for this Task will be as per Revegetation Specification 20.0. <br />Revegetated areas will be measured to the nearest 0.1 acre and paid at the unit price bid on the <br />Bid Schedule Item 4. The price bid shall include all costs for labor, materials, equipment and all <br />other items necessary for revegetation as described in these specifications, including work at the <br />coal mine waste disposal area, the cut and fill slopes, adjacent disturbances and on all access <br />point and roads. Payment for this task will be made only for the unit price shown under Item 4 of <br />the Bid Schedule. Payment shall be as this task is completed and approved by the PROJECT <br />MANAGER. <br />Task 5 Equipment Rental <br />Additional areas in and adjacent to the Project Area may additional work. A CAT DEC or <br />equivalent 80 FHP machine with operator, and a CAT 416B Backhoe loader or equivalent 74 fhp <br />machine with operator. <br />The hours outlined in Item 5 of the Bid Schedule are NOT guaranteed. All work will be <br />accomplished according to Specification 19.0, Equipment Rental, attached. <br />Measurement and Payment <br />Measurement and payment will be made as per Specification 19.0, Equipment Rental, which is <br />attached. Payment will be made at the unit prices established in Item 5 of the Bid Schedule. The <br />hours outlined in Item 5 of the Bid Schedule are NOT guaranteed. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br />and ensure that each work item is completed and constructed to design specifications. The <br />PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on <br />weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval <br />of the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections with the <br />Project Manager so as not to delay the work. The following items must be observed and approved <br />by the PROJECT MANAGER before proceeding with additional work: <br />1. Upon completion of topsoil removal operations at the disposal area; <br />2. Upon completion of opening the mine roof and placement of the rock or concrete back <br />stop material; <br />3. Upon completion of filling of the mine with coal mine waste; <br />4. Upon completion of coal mine waste cut operations; <br />
The URL can be used to link to this page
Your browser does not support the video tag.