My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41635
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:59 PM
Creation date
11/23/2007 11:18:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981046
IBM Index Class Name
General Documents
Doc Date
6/14/1999
Doc Name
DOCUMENTED QUOTE SUNLIGHT COAL MINE RECLAMATION PROJECT PKA-0-1071
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Surface Roughening Specifications <br />Severe surface roughening will follow topsoil and mulch application. In order to accomplish the <br />degree of severity of roughening required, the following will be accomplished by the <br />CONTRACTOR: <br />Apply Topsoil; <br />Apply two (2) tons per acre weed free mulch, simultaneously with slope scarification; <br />Scarify the surface by using a trackhoe bucket to gouge or pull the topsoil and mulch <br />toward the machine in a manner such that no less than fifteen inches (15") of vertical <br />relief is created. These gouges shall be sufficiently close so that no more than twelve <br />inches (12") exists between the crest of one gouge and the crest of an adjacent gouge, <br />in any direction. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 2 on the Bid Schedule. This lump sum bid will cover all costs for soil distribution, <br />mulch application and surface roughening. Payment shall be as this task is completed and <br />approved by the PROJECT MANAGER. Such payment shall be considered full compensation for <br />all labor, materials, equipment and all other items necessary and incidental to the completion of <br />Task 2. <br />TASK 3 FINAL GRADING <br />A small amount of grading work may be required at the newly exposed surface where the coal <br />mine waste was excavated. Grading, if undertaken, will be directed at stabilizing the hill slope <br />through minor grading practices and scaling to prevent rockfalls. It is estimated that no more than <br />eight (13) hours of track hoe and / or light dozer time would be expended in accomplishing this <br />Task. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 3 on the Bid Schedule. This lump sum bid will cover all costs for scaling efforts and <br />other minor grading as required in the field. Payment shalt be as this task is completed and <br />approved by the PROJECT MANAGER. Such payment shall be considered full compensation for <br />all labor, materials, equipment and all other items necessary and incidental to the completion of <br />Task 3. <br />TASK 4 REVEGETATION <br />All areas disturbed during reclamation work and any other areas specified in these Special <br />Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br />Specifications. Commercial fertilizer is required for this project, and will be supplied by <br />CONTRACTOR. Seed will be supplied by the OWNER. <br />All areas disturbed during reclamation work and any other areas specified in these Special <br />Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br />Specifications Section 20.0, except as modified by these Special Conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.