Laserfiche WebLink
Special Surface Roughening Specifications <br />Severe surface roughening will follow topsoil and mulch application. In order to accomplish the <br />degree of severity of roughening required, the following will be accomplished by the <br />CONTRACTOR: <br />Apply Topsoil; <br />Apply two (2) tons per acre weed free mulch, simultaneously with slope scarification; <br />Scarify the surface by using a trackhoe bucket to gouge or pull the topsoil and mulch <br />toward the machine in a manner such that no less than fifteen inches (15") of vertical <br />relief is created. These gouges shall be sufficiently close so that no more than twelve <br />inches (12") exists between the crest of one gouge and the crest of an adjacent gouge, <br />in any direction. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 2 on the Bid Schedule. This lump sum bid will cover all costs for soil distribution, <br />mulch application and surface roughening. Payment shall be as this task is completed and <br />approved by the PROJECT MANAGER. Such payment shall be considered full compensation for <br />all labor, materials, equipment and all other items necessary and incidental to the completion of <br />Task 2. <br />TASK 3 FINAL GRADING <br />A small amount of grading work may be required at the newly exposed surface where the coal <br />mine waste was excavated. Grading, if undertaken, will be directed at stabilizing the hill slope <br />through minor grading practices and scaling to prevent rockfalls. It is estimated that no more than <br />eight (13) hours of track hoe and / or light dozer time would be expended in accomplishing this <br />Task. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 3 on the Bid Schedule. This lump sum bid will cover all costs for scaling efforts and <br />other minor grading as required in the field. Payment shalt be as this task is completed and <br />approved by the PROJECT MANAGER. Such payment shall be considered full compensation for <br />all labor, materials, equipment and all other items necessary and incidental to the completion of <br />Task 3. <br />TASK 4 REVEGETATION <br />All areas disturbed during reclamation work and any other areas specified in these Special <br />Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br />Specifications. Commercial fertilizer is required for this project, and will be supplied by <br />CONTRACTOR. Seed will be supplied by the OWNER. <br />All areas disturbed during reclamation work and any other areas specified in these Special <br />Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br />Specifications Section 20.0, except as modified by these Special Conditions. <br />