My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41635
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:59 PM
Creation date
11/23/2007 11:18:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981046
IBM Index Class Name
General Documents
Doc Date
6/14/1999
Doc Name
DOCUMENTED QUOTE SUNLIGHT COAL MINE RECLAMATION PROJECT PKA-0-1071
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF h11NERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />131 ]Sherman 51., Room 21> <br />Denver, Colorado 80203 <br />Phone. (3011 8G6~3557 <br />FAY: (303) 832 8106 <br />DATE: June 14, 1999 <br />TO: Interested Contractors <br />,~`~~ I ~ <br />loU <br /> <br />6 ~ YN~ r r l c~' <br />~~1 <br />i <br />rJ <br />FROM: Steven Renner, Division of Minerals and Geology <br />Cv~ <br />$ss ~~(/ <br />l~~u/ 5` <br />W <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />M ININ G'SAFETY <br />sill o..~n. <br />Governor <br />~fyrcq E. Walchcr <br />r yc~culi~ia•UOr <br />G(~, ~ /.yeh~el B Lang <br />rr~ D ~j~~tyrecbr <br />RE: Documented Quote, Sunlight Coal Mine Reclamation Project (PKA-0-1071) ~~ ~P'J <br />Enclosed is a brief description, site map and bid schedule for the Sunlight Coal Mine Reclamation `~ ~ Y~r <br />Project Ir I ~ <br />y <br />The project is located twelve (12) miles from Glenwood Springs, near the Sunlight Ski Area. r <br />Please see Map 1, General Location. n ~ •~ ~ <br />WORK SUMMARY ~ dlr (f D <br />6 v' <br />The project work will include removal and disposal of cribbing materials; excavation, transportation <br />and placement of mine waste materials; topsoil salvage and placement; general grading and <br />revegetation. ~j <br />/O<'Y ~/ <br />PRE-BID MEETING AND SITE SHOWING <br />A mandatory pre-bid meeting and site showing will be held at 10:30 a.m., on July 13, 1999. The <br />Pre-Bid Meeting will be held at the job site. Please see Map 1, General Location. <br />The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site and vicinity. <br />Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid meeting for firms <br />to register their attendance. It is the bidder's responsibility to make certain their attendance is <br />recorded on the sign-in sheet. Failure to sign-in or to attend the entire meeting will be cause for <br />rejection of a bid. <br />THIS PRE-BID MEETING INVOLVES INSPECTION OF HAZARDOUS AND UNSTABLE MINE <br />OPENINGS. THE SAFETY OF PROSPECTIVE BIDDERS IS OF UTMOST IMPORTANCE TO <br />THE DIVISION OF MINERALS AND GEOLOGY. NO ONE WILL BE ALLOWED WITHIN 15 <br />FEET OF ANY VERTICAL MINE OPENING WITHOUT PROPER SAFETY EQUIPMENT <br />INCLUDING: SAFETY BELT OR HARNESS PROPERLY SECURED TO A SAFETY LANYARD <br />AND ANCHOR. NO ONE WILL BE ALLOWED TO EXAMINE ANY HORIZONTAL MINE <br />OPENING WITHOUT WEARING A HARD HAT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.