My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41563
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:48 PM
Creation date
11/23/2007 11:15:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
1/14/1986
Doc Name
Comments on permit Revisions
From
OSM
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />M r <br />7 <br />The geological information contained in the R2P? was reviewed by a staff <br />geologist and found to be sufficient for use by the geologists and mining <br />engineers. Appropriate geological maps were also submitted for use in <br />determining the extent of the coal reserves contained on the leases in <br />questions. <br />Tne following coal quality data was contained in the R2P2 package on a <br />seam by seam basis for the seams to be mined: <br />0 Moisture wt i <br />0 Ash wt S <br />0 Sulfur rt S <br />0 Volatile Metter wt S <br />0 Fixed Carbon wt S <br />0 Heating Value Btu/lb <br />0 Summary of Mineral Analysis of Ash Data and Cnlorine content <br /> including, Si02, A1203, Ti 02, Fe203, CaO, MgO, K20, <br /> Napo, 503, P205, SrO, BaO, Mn304, undetermined, and <br /> cniori ne. <br />This information is of sufficient quality to determine the quality of the <br />mineable reserve base. <br />Tne coal seams will be mined using Longrrall and conventional (Roam b <br />Pillar) mining techniques with the standard equipment associated with <br />these two mining practices. Mining sequence information 1s contained an <br />mine plan maps showipg development on a year by year basis. The <br />production rate is contained in the text of the R2P2 on a year Dy year, <br />seam Dy seam oasts. The estimated overall recovery factor for the two <br />seams to be ai ned ( the B 8 D seams ) 1 s 42.6 percent. The iota 1 number of <br />acres contained by the five (5) leases (C-023703, D-041201, C-0126669, <br />C-8424, and C-8425) is 6441.60. <br />The estimated reserve bases were submitted Dy the company including <br />in-place, alneable, and recoverable reserves. These figures were checked <br />for accuracy Dy the staff of Lhis office for all segos. Further analysis <br />was performed for the two seams to be eined since mineable and recoverable <br />reserves are only present in the B and D seams. The results of this <br />analysis are as follows: <br />The total in-place reserves were calcualted by a staff geologist at this <br />office. <br />c ~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.