My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41476
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:28 PM
Creation date
11/23/2007 11:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987024
IBM Index Class Name
General Documents
Doc Date
3/30/2001
Doc Name
COREY GRAVEL PIT 3 PN M-1987-024 RECLAMATION COST RECALCULATION NOTICE OF BOND INCREASE
From
DMG
To
ROBERT D & LAVELLE COREY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date. 03/27/2001 <br />User . RCO <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Montrose <br />Site :Corey Gravel P8 ik? <br />Agency or organization name : DMG <br />Permit or other job action Bond review <br />Task description :Fill highwall cavity, construct toe ditch (drainage or irrig.) <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 200 <br /> Utilization °!o <br />OwnershipcosUhour : $43.32 NA <br />Operating cosVhour : $49.44 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $120.75 Total fleet cosUhour <br />CCY <br />Swel I Loose <br />factor : 1.125 volume : 225 <br />5120.75 <br />LCY <br />Source of estimated volume '. approved reclam plan, 2/23701 insp <br />Source of estimated swell factor : n/a <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 5, 800 feet <br />Material weight : 2, 650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility . 1.00 <br />Job efficiency : 0.83 <br />Spoil pile: 0.80 <br />Push gradient : 1.00 <br />Altitude : 0.95 <br />Material weight : 0.87 <br />Blade type . 1.00 <br />Net correction : 0.91 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.288 /LCY <br />Basic machine : Caf D7R - 7SU Horsepower : 230 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank upper <br />Permitfjob# : M-1987-024 <br />Abbreviation :none <br />Filename : M024-001 <br />Source <br />419.87 LCYlhr <br />419.87 LCY/hr <br />0.54 Hours <br />$85 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.