Laserfiche WebLink
N ~ <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date . 27-Mar-2001 <br />User : RCO <br />Permit or job no. <br />Abbreviation <br />Filename <br />Agency or organization name : DMG <br />Permit or job action .Bond review <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Rll highwall cavdy, construct [oe ditch (drainage or irrig.) dozer 1 0 54~ $65 <br />002 -Rough grade pit (loot, 7 ac, suitable for vrigation dozer 1 27.2 $3, 294 <br />003 -Rip compaction on pit floor (excl roads) ripper 1 17.6 $2, 238 <br />004 -Haul topsoil to highwall /or spreading scraper2 1 6.9 $1,187 <br />005 -Haul topsoil across pit floor for spreading scraper2 1 15.83 $2,695 <br />006 -Spread topsoil on highwall dozer 1 4.9 $600 <br />007 -Spread topsoil on pit Door dozer 1 14.66 $1,770 <br />008 -Revegetate site according to approved plan revege 1 16.0 $2, 663 <br />009 -Haul reclamation equipment to and from site mobilize 1 2.4 $1,279 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 106.3 $15,791 <br />• includes inflation !actor adjustment of : NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT• Llabty lnSUranCe: <br />Performance bond. <br />Job superintendent: <br />Profit : <br />'not required (or eqp. operaror serves as supecJ <br />PROJECT MANAGEMENT- <br />Engineeringwork and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />•conungencies accounfetl rot at task level <br />M•1987-024 <br />none <br />M024-000 <br />Site :Corey Gravel Pit tR3 <br />Stale .Colorado <br />County :Montrose <br />TOTAL DIRECT COST'= $15,791 <br />1.55 % o/direct total = $245 <br />1.05 % of direct total = $166 <br />NA' NA NA total = NA <br />10.00 % of direct total = $1,579 <br /> TOTAL08P= $1,990 <br /> CONTRACT AMOUNT (duet( ~ O 6 P) _ $17, 781 <br />NA NA NA total = NA <br />5.00 % of cnlr. NA total = $889 <br />NA' NA total = NA <br /> TOTAL INDIRECT COST = $2,879 <br />TOTAL BOND AMOUNT (direct+ indirect) = 818,670 <br />