<br /> <br />Page 2 <br />It is anticipated that we will continue building lower sections of <br />terraces as they are intersected for access into the draw. After <br />the check dams are finished we will proceed with Phase 3 of the <br />project which will be construction of the 14 terraces to a point as <br />high on the ridge as possible without interfering with West Ridge <br />final grading at the top of the ridge. <br />Should you have any questions regarding this material, please <br />contact me at the mine site. <br />Sincerely, <br />C\-~~\\ . `-~~-- <br />David Beverlin <br />Resident Engineer <br />