<br />Kent Gorham <br />November 14, 1994 <br />Page 2 <br />Twentymile, by conducting topsoil salvage operation at this time <br />should minimize any operational problems that might arise if <br />topsoil salvage was delayed until April. Likewise, by completing <br />this operation it will allow Twentymile to complete construction of <br />the under drain next spring without having to worry about topsoil <br />salvage. This will provide Twentymile the opportunity to start <br />constructing the refuse pile once the preparation plant starts <br />running next May. It is understood that Twentymile must receive <br />approval from the Division prior to construction of any under <br />drains. However, with the technical revision package planned to be <br />submitted within the next 10 to 14 days this should not be a <br />problem. <br />If there are any questions on the above, please contact me at your <br />convenience. <br />Sincerely, <br />Rick Mills <br />Surface/Environmental Manager <br />RM/tlc <br />