My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41274
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:08:30 PM
Creation date
11/23/2007 11:07:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
7/23/1984
Doc Name
C-037-81
From
CURTIS L MILLER
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 July 1984 <br />Page 5 <br />Equipment list -------- (typical) <br />1 ---- D-8 Dozer <br />2 or more ---- 24 cu. yd. scrapers <br />1 ---- Fuel truck <br />1 ---- Road Maintainer (part time) <br />1 --- 4-5 cu. yd. front end loader (part time) <br />1 or 2 --- 12 ton to 22 ton End dump truck (part time) <br />1 ---- ? cu, yd. Dragline (part time) <br />ADVERSE WEATHER CONDITIONS ------- <br />While almost all dozer work can be done regardles of weather, it must be em- <br />phasized that scraper operations depend upon virtually dry, firm conditions. <br />Mud and snowy conditions obviate any meaningful movement of yardage. <br />Fortunately, the winter and spring weather at GEC's site will allow scraper <br />work here most of nine or more months of the year. In deep winter and spring <br />runoff times only dozer work can be accomplished. <br />Operations will be able to continue throughout most of the year with proper <br />equipment scheduling. <br />APPROXIMATE TIMECHART FOR BEGINNING ANG COMPLETIONS OF RECLAMATION PHASES ---- <br />PHASE 1984 1985 198E 1987 1988 1989 1990 1991 1992 <br />West pit <br />backfill -------- <br />finish grade ------ <br />~~s~2pit -------- <br />East pit ---------------------- <br />finish grade -------- <br />OS #i <br />Lowering ---------------------------- <br />Reducing sides --------------- <br />Finish grade - - -- ----- <br />East Pit Plan 1 <br />Backfill -------------------------------------------------- <br />Finish grade -- -- --- ---- ----- ---- <br />Topsoil Stockpile #1 <br />West pit _______ <br />Topsoil Stockpile #2 <br />East pit -- -- --- ---- -- <br />East pit finish grade --- ----- ---- <br />East Pit Plan 2 <br />Backfill ---------------------------- <br />Finish grade -- -- ---- --------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.