Laserfiche WebLink
__~_ <br />Stipulation No. 14 <br />THL APPLICANT TN ST REVISE THE PROPOSED REVECETATION SUCCESS CRITERIA <br />TO RELATE TO ^ERBACEOUS RATHER TkiAN WOODY COP@tUNITIES IN ACCORDANCE <br />WITH RULE 4,15.8 IJITHIN 6 MONTHS OF PERMIT LSSUANCE. <br />Sediment ponds will be retained until the revegetation is termed successful. <br />At this [ime the unnamed drainage which follows into sediment pond K must <br />be reconstructed. No plans were provided for the reconstruction of this <br />channel, tl~ereEore the following stipulation is necessary: <br />Stipulation No. ].5 <br />PLANS FOR RECONSTRUCTION OF THE UNNADfED TRIBUTARY OF PRYOR CREEK IN <br />ACCORDANCE [JITH RULES 2.05.4(2)(c) AND 4.05.4 P1UST BE PROVIDED TO <br />THE DIVISION 1dITHIN 6 MOtdTHS OF PERMIT ISSUANCE AND THE BOND AMOUNT <br />PNST BE REEVe1LUATED AND ADJUSTED IF DEEMED NECESSARY. <br />Pursuant to Rules 2.07.6(2)(j) and 3.02.1(1), the performance bond in the <br />amount of $58,073.00 must be filed with the Division, payable to the State <br />of Colorado, before a permit will be issued. Also, bond must be submitted <br />within 30 days following final approval of the permit. Therefore, the <br />following stipulation is necessary: <br />Stipulation No. 16 <br />A PERFORPIANCE BOND IN THE AMOUNT OF $53,073.00, PAYABLE TO THE <br />STATE OF COLORADO, PHJST BE FILED (JITH THE DIVISION? LJITHIN 30 <br />DAYS FOLLOIJING FINAL APPROVAL OF THE VIt;ING PERMIT APPLICATION. <br /> <br />