Laserfiche WebLink
APPENDIX I <br />Revisions Since 1985: Mt. Gunnison Mine No. 1 <br />Minor Revisions <br />Minor Revision No. 2 Expansion of parking lot adjacent to the bathhouse <br />Action: Approved 5/6/85 <br />Minor Revision No. 3 Rededication of the initial waste rock storage area <br />as a new pad for shop expansion <br />Action: Approved 6/10/85 <br />Minor Revision No. 4 Drilling of four auger holes to access foundational <br />characteristics <br />Action: Approved 6/13/85 <br />Minor Revision No. 5 Installation of 4 to 8 groundwater monitoring wells <br />Action: Approved With Conditions, 8/12/85 <br />Minor Revision No. 6 Consolidation of trash dumpsters near portal bench, <br />construction of small parking area east of FW Pond <br />Action: Approved 6/13/85 <br />Minor Revision No. 7 Use of a fill borrow area, north of topsoil stockpile, <br />all drainage from which will be directed to the <br />existing access road ditch. One dozer width buffer <br />zone shall be maintained on the north and west sides. <br />Action: Approved 8/13/85 <br />Minor Revision No. 8 Revision of a portion of Sylvester Gulch <br />powerline from buried to overhead. <br />Action: Approved 8/21/85 <br />Minor Revision No. 9 Expansion of equipment building parking lot <br />Action: Approved 9/4/85 <br />Minor Revision No. 10 Relocation of water treatment plant filter backwash <br />pipeline <br />Action: Approved 10/2/85 <br />Minor Revision No. 11 Main mine access road landslide repair plan <br />Action: Approved 10/29/85 <br />Minor Revision No. 12 Placement of a 24 inch culvert in lieu of a drainage <br />ditch at the equipment building parking lot <br />Action: Approved 12/12/85 <br />