Laserfiche WebLink
Stipulation No. 12 <br />THE DIVISION DIRECTS WECC TO COMPLETE THE INSTALLATION OF THE SUBSIDENCE <br />MONITORING NETWORK PRIOR TO THE INITIATION OF EXTRACTION OF COAL WITHIN <br />THE PAtJEL DESIGNATED IN APPENDIX A TO THE NOVEMBER, 1984 PERMIT REVISION <br />APPLICATION ENTITLED "APPLICATION TO REVISE THE MINING AND RECLAMATION <br />PLAN FOR THE MT. GUNNISON N0. 1 UNDERGROUND MINE". THIS MONITORING <br />NETWORK IS DESIGNED TO MONITOR THE FIRST PANEL WEST FROM THE SW MAINS <br />INTAKES AtJD SOUTH OF THE N0. 1 WEST SUBMAINS, DESIGNATED AS "PANEL <br />1tJ-1S", LOCATED ADJACENT TO AND PARALLEL TO THE WESTERN BOUNDARY OF <br />SECTION 2T, RANGE 90W, TOWNSHIP 135. THIS MONITORING NETWORK SHALL <br />CONSIST OF SUBSTANTIAL MONUMENTS DESIGNED TO RESIST FROST-HEAVE, FIRE, <br />AND THE ACTIONS OF CATTLE AWD WILDLIFE. <br />Status: Complied With. <br />Stipulation No. 13 <br />THE SUBSIDENCE MONITORI~ NETWORK SHALL BE SURVEYED UTILIZING <br />CONVENTIONAL GROUND SURVEYING TECHNIQUES, DESIGNED TO ACHIEVE HORIZONTAL <br />ACCURACIES COMPLYING WITH THE U.S. DEPARTMENT OF COMMERCE'S "SECOND <br />ORDER, CLASS II" SURVEY STANDARDS, AND VERTICAL ACCURACIES NO LESS THAN + <br />0.2 FEET. THIS GRID SHALL BE SURVEYED TWICE PRIOR TO THE INITIATION OF <br />SUBSIDENCE. IN COtJJUNCTION WITH THESE SURVEYS WECC SHALL SELECT AND <br />ESTABLISH A MINIMUM OF SIX TRIANGULATION BENCH MARK MONUMENTS OUTSIDE THE <br />AREA OF ANTICIPATED SUBSIDENCE EFFECTS, FOR THE PURPOSE OF CORRELATION <br />WITH AERIAL PHOIOGRAMMETRIC POST-SUBSIDENCE SURVEYS. <br />Status: Complied With. <br />Stipulation No. 14 <br />WECC HAS REQUESTED PERMISSION TO COMPLETE A PRE-SUBSIDENCE AERIAL <br />PHOTOGRAMMETRIC SURVEY OF THE SUBSIDENCE MONITORING GRID, FOR THE PURPOSE <br />OF CORRELATION WITH THE FIELD SURVEY RESULTS. IT IS WECC'S INTENTION TO <br />UTILIZE AERIAL PHOTOGRAMMETRIC METHODOLOu"Y TO MONITOR POST-SUBSIDENCE <br />MOVEMENTS OF THE SUBSIDENCE MONUMENTS. THE RESULTS OF THE PRE-SUBSIDENCE <br />FIELD AND AERIAL PHOTOGRAMMETRIC SURVEYS SHALL BE COMPARED FOR EACH GRID <br />MONUMENT. THE AERIAL SURVEY WILL BE ACCEPTED AS ACCURATE AND WILL BE <br />USED FOR SUBSEQUENT POST-SUBSIDENCE MONITORING, IN THE EVENT THAT THE <br />AERIAL PHOTOGRAMMETRIC AND FIELD SURVEYS CORRELATE WITH AN AVERAGE SURVEY <br />POINT LOCATION DEVIATION OF LESS THAN 0.2 FEET VERTICALLY AND <br />HORIZONTALLY, WITH SURVEY POINT LOCATION DEVIATIONS OF LESS THAN 0.4 FEET <br />VERTICALLY AND HORIZONTALLY FOR LESS THAN 95 ", OF THE SURVEY POINTS, AND <br />WITH NO SIAGLE SURVEY POI N7 LOCATION DEVIATION VERTICALLY OR HORIZONTALLY <br />IN EXCESS OF 0.8 FEET. <br />Status: Forgiven. <br />