My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41175
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:00:18 PM
Creation date
11/23/2007 11:03:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/1/1989
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 9 <br />ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE, PURSUANT TO RULE 2.04.7 (1)(b), A <br />MAP SHOWING THE PIEZOMETRIC SURFACE OF THE COLLUVIAL AQUIFER IN THE AREA <br />OF THE LOWER PERMANENT UNDERGROUND DEVELOPPdENT WASTE PILE, IF ONE <br />DEVELOPS. <br />Status: Active. <br />Stipulation No. 10 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY TO COMPLETE A THOROUGH <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE PROPOSED UPPER WASTE PILE ACCESS <br />ROADWAY CORRIDOR. THE APPLICANT SHALL PLACE SPECIFIC EMPHASIS UPON THE <br />DETECTION OF SLOPE INSTABILITY EVIDENCE AND DRAINAGE CHARACTERISTICS OF <br />THE PROPOSED ROAD ALIGNMENT. <br />FURTHER, THE DIVISION DIRECTS WEST ELK COAL COMPANY, UTILIZING THE <br />RESULTS OF THE RECONNAISSANCE GEOLOGIC MAPPING, AND EARLIER ADJOINING <br />SURFACE FACILITY ROAD DESIGN STUDIES, IF APPROPRIATE, TO COMPLETE A <br />PRELIMINARY ACCESS ROAD CUT-SLOPE STABILIZATION AND DRAINAGE DESIGN. <br />THE MAPPING AND PRELIMINARY DESIGN SHALL BE APPROVED BY THE DIVISION, IN <br />WRITING, PRIOR TO ANY DISTURBANCE OF THE ACCESS ROAD CORRIDOR. <br />Status: Future. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY TO CONSTRUCT THE UPPER WASTE <br />PILE ACCESS ROAD AS AN INITIAL PIONEER ROAD WITH MINIMIZED EXCAVATION. <br />UPON EXPOSURE OF THE EXCAVATED CUT-SLOPES OF THAT PIONEER ROADWAY, THE <br />OPERATOR SHALL COMPLETE A FINAL GE OTECHNICAL INVESTIGATION OF THE ACCESS <br />ROAD CORRIDOR. THIS GEOTECHNICAL INVESTIGATION SHALL BE COMPLETED BY <br />APPROPRIATELY QUALIFIED PROFESSIONAL GEOLOGICAL OR ENGINEERING <br />PERSONNEL. THE PURPOSE OF THIS FINAL INVESTIGATION SHALL BE TO VERIFY, <br />OR APPROPRIATELY AMEND, THE FINDINGS OF THE RECONNAISSANCE GEOLOGIC <br />MAPPING OF THE ROADWAY CORRIDOR. <br />FURTHER, WEST ELK COAL COt4PANY, UTILIZING THE FINDINGS OF THE FINAL <br />GEOTECHNICAL INVESTIGATION, SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE <br />AND DRAINAGE DESIGN FOR THE UPPER WASTE PILE ACCESS ROAD. THIS FINAL <br />DESIGN SHALL BE APPROVED BY THE DIVISION, IN WRITIN;, AND THE <br />CONSTRUCTION COMPLETED IN ACCORDANCE WITH THAT DESIGN, PRIOR TO THE <br />TRANSPORTATION OF ANY WASTE MATERIAL ALONG THAT ACCESS ROAD. <br />Status: Future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.