Laserfiche WebLink
• <br />TO: Kathleen Sullivan <br />Illlllllilllll11111 ~~"""' `` <br />sss <br />12/17/98 <br />RECEIVED <br />DEC 2 3 1998 <br />--.~ ^ ' 9 Division of Minerals 8 <br />l:ROM: B ce Smith 'fir ,- y ~t~~~`+V,'': <br />all- 4A"~h~i ~. ~~"'ffl o <br />P: <br />SUB.IECT: Pridemore and very Structures gravel pits ~~ '~ •~ ?~g <br />WtrTFR R,rp, <br />ale rc enr,::,rc_`e3 <br />rrtr .. A <br />I'm sorry this response has been so long in coming. i have been in contact with Jim Dillie <br />at the CDMG. <br />I was able to get in touch with the people at Avery Structures. They have initiated a <br />Substitute Supply Plan using water from the City of Pueblo with intent to go ahead with <br />an augmentation plan in the future. So I don't see any problem with their operations. <br />The Pridemore gravel pit is harder to bring to a satisfactory conclusion. The owner of the <br />property has recently retired out of state and has been incommunicado for the last month. <br />[t is the owner of the property who wants the ponds left on site. Mr. Pridemore has no <br />more continued need for either the gravel supply or the ponds. I have tried repeatedly to <br />leave messages with the owner so I can explain the situation with him so Mr. Pridemore <br />can come to closure with his reclamation plan for CDMG. <br />However at this point I am unable to do more. Especially since at this point the owner <br />doesn't have an address for correspondence. <br />I will let you know of any updates as they happen. <br />