My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41025
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:00:08 PM
Creation date
11/23/2007 11:00:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990041
IBM Index Class Name
General Documents
Doc Date
6/29/1993
Doc Name
COLO WASTEWATER DISCHARGE PERMIT SYSTEM CO-0043168 GOLDEN MILL JOINT VENTURE
From
CDOH
To
GOLDRUSH MINING CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A. MANAGEMEtdT REQUIRElIENTS <br /> <br />PART II <br />Page 12 of 19 <br />4. Submisaion of Incorrect or Incomplete Information <br />iihere the permittee failed to submit any relevant facts in a permit <br />application, or ^ubmitted incorrect information in a permit <br />application or report to the Division, the permittee shall promptly <br />submit the relevant'application information which xas not submitted <br />or any additional information needed to correct any erroneous <br />information previously submitted. <br />5. Bypass <br />The permittee may allow any bypass to occur which does not cause <br />effluent limitations to be ezceeded, but if and only if it is far <br />essential maintenance to assure efficient operation. <br />Bypass is prohibited, and the Division may take enforcement action <br />against a permittee for bypass, unless: <br />a) Hypass xas unavoidable to prevent loss of life, personal <br />injury, or severe property damage; <br />b) There were no feasible alternatives to the bypass, such as the <br />use of auziliary treatment facilities, retention cf untreated <br />wastes, or maintenance during normal periods of equipment <br />downtime. Thin condition is not satisfied if the permittee <br />could have installed adequate backup equipment to prevent a <br />bypass which occurred during normal periods of equipment <br />downtime or preventative maintenance; and <br />c) The permlttee submitted notices as required i^ "Bypass <br />Notification", Part II.A.6. <br />f.. Bypass Notification <br />If the permittee knows in advance of the need for a bypass, a notice <br />shall be submitted, at least ten days before the date of the bypass, <br />to the Divi9lon and the Environmental Protection Agency (EPA). The <br />bypass shall be subject to Division approval and limitations imposed <br />by the Division and EPA. <br />Code: i - 26 Date: 1-84, revised 12-15-86, revised 12-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.