Laserfiche WebLink
Excess Spoil Fills <br />The engineer verification of shallow bedrock prior to <br />construction of the underdrain was a requirement for the original <br />design of the Section 16 fill, not the revised configuration of the <br />fill. However, the subdrain is constructed on bedrock material <br />which is noted within the ongoing fill inspection documentation. <br />Bonding <br />Colowyo submitted the revised bonding information on October <br />20, 1992. <br />Texaco Oil Spill <br />Texaco has completed their work on the subject crude oil <br />pipeline spill. <br />Maintenance Items <br />All ten maintenance items have been addressed by Colowyo. <br />If you have any questions or need additional information, <br />please give me a call. <br />Sincerely, <br />~ ~. ~'~ <br />~es A. Kiger <br />Sr. Environmental Specialist <br />JAK/gdf <br />cc: R. G. Atkinson <br />J. P. Garcia <br />Central Files <br />