Laserfiche WebLink
III IIIIIIIIIIIIIIII <br /> <br />COAL <br />COMPANY <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />(303) 824-4451 <br />October 29, 1992 <br />Mr. Larry Routten <br />Colorado Division of Minerals and Geology <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: C-81-019, Colowyo Coal Company <br />Follow-up on September Inspection <br />and October 21, 1992 meeting <br />with CMLRD <br />Dear Mr. Routten, <br />.., <br />NOV 21992 <br />DIU:5~Ur• ~.~ <br />The purpose of this letter is to provide a follow-up to the <br />above referenced inspection and meeting in order to either <br />summarize our conversations and/or facilitate the resolution of a <br />number of issues. <br />Records <br />All blasting records for the last year have been modified to <br />include a key to the blast pattern sketches. Blasting reports <br />continue to comply with the regulations and in the future will <br />include keys to the blast pattern sketch. <br />Signs <br />The Identification sign was returned to the mine entrance. <br />Roads <br />The minor revision request for the Dragline relocation road <br />was submitted to the Division on October 15, 1992. <br />Hydrologic Balance <br />The September 28, 1992 Findings Document for C-81-019 provided <br />documentation on page 14 regarding Colowyo's commitment for annual <br />sediment pond sediment surveys with final submittal in the annual <br />report. A copy of the page is now included with the sediment pond <br />inspection reports. <br />