Laserfiche WebLink
TABLE 2-2 (modiTed) <br />MINE PANEL DISTURBANCE IN ACRES' <br /> Proposed Action Aeeelented Development <br /> <br />Mine Panel <br />Year <br />7ota1 Antes <br />~ Panel Temporary/ <br />Corwtructlon <br />Distitrbanee Syear <br />Operation <br />Disturbance _- <br />Total Area <br />of Panel Tempxary/ <br />Construetlon <br />Diabnlaanee S-year <br />Operation <br />Disturbance <br />0 - 5 160 34 75 541 115 254 <br />5-]0 209 44 98 489 1(~4 229 <br />IO - 15 l72 37 81 - -• - <br />15 - 20 167 35 78 - -- - <br />20 - 25 125 27 59 - -- - <br />25 - 30 197 42 92 - -• - <br />Total 1,030 219 483 1,030 219 483 <br />'Mine panel disturbances were estimated based on a ratio of the calculated disturbed area m~ the 0-5 year panel to the <br />total area of the 0-5 yeaz panel. Disturbance in the mine panels includes consideration of: <br />• All well field roads <br />• Well pads <br />• Piping system <br />• Electrical distribution line <br />• Well field pump station <br />CJ <br /> <br /> <br />Sheet 2 of 2 <br />