Laserfiche WebLink
<br /> <br /> <br />TABLE 2-2 (modified) <br />SUMMARY OF ACRES DISTURBED <br />Long-Tenn (30-Years) Disturbance in Acres <br />Component Proposed Action Accelerated Dev. AIL <br />Piceance Site <br />Test Facility 13 No change <br />Processing Plant 6.5 No change <br />Evaporation Pond 23 60 <br />Main Access Road from Horse Ihaw' 12.9 No change <br />Well Field Service Road (test facility to plant)Z 9.8 No change <br />Yellow Creek Jeep Trail Realignment 5.2 No change <br />Natural gas (ROW 12 ft), Alt. A' 1_8 No change <br />Subtotal 722 107.4 <br />Pipeline <br />Product pipeline (ROW 30-50 ft)' 267 No change <br />Two pump stations at Davis Point _ 4 <br />Subtotal 267 27l <br />Parachute Site <br />Area of New Disturbances: <br />Rocessing Plant and Substation 4.7 8.7 <br />Rail Loadout Facilities 16.6 No change <br />Stormwa[er Retention Pond 2 No change <br />MVR Purge Pond 33 47 <br />Subtotal 56.3 74.3 <br />1. The main access road would be 40 ft. wide including 4-foot shoulders and 8-foot drainage ditches and berms. <br />The asphalt cover is 4 inches thick. <br />2, The well field access road would be 28 ft. wide including shoulders. <br />3. Alternative B gas pipeline route would follow the proposed project pipeline route. There would be no <br />additional ground disturbance for conswction or operation. <br />4, Product pipeline construction ROW is 125 ft. wide causing 667 acres of temporary disturbance, plus Z4 20 <br />aces for 6 5 construction laydown areas and 25 45 acres for ZS 45 temporary use areas. Total temporary <br />disturbance is 7.].G 732 acres. <br />5. The water storage pond and evaporation pond would be construMed by modifying existing facilities and is <br />therefore oot included as new acres disturbed. <br />Sheet 1 of 2 <br />