Laserfiche WebLink
notifications for temporary cessation, until the permit was placed in permanent cessation on 26 <br />August 1993. Reclamation of the site began on 4 January 1995 and was completed in November <br />1995. <br />The second permit renewal was dated 13 January 1995, for a period of 5 yeazs. Following this <br />second renewal, the following revisions were approved: <br />Technical Revision 10, decision date 2 May 1995 <br />Technical Revision 11, decision date 2 May 1995 <br />Technical Revision 12, decision date 2 May 1995 <br />Technical Revision 13, decision date 23 January 1996 <br />Technical Revision 14, decision date 25 April 1996 <br />Technical Revision 15, decision date 15 July 1996 <br />Minor Revision 16, decision date 10 February 1995 <br />Minor Revision 17, decision date 3 May 1995 <br />Minor Revision 18, decision date 2 June 1995 <br />Minor Revision 19, decision date 11 September 1995 <br />Minor Revision 20, decision date 14 September 1995 <br />Minor Revision 21, decision date 11 October 1995 <br />Minor Revision 22, decision date 10 October 1995 <br />Minor Revision 23, decision date 14 November 1995 <br />Minor Revision 24, decision date 15 July 1996 <br />Minor Revision 25, decision date 12 August 1996 <br />Minor Revision 26, decision date 19 September 1997 <br />Minor Revision 27, decision date 17 November 1999 <br />The third permit renewal was received on 6 July 1999, called complete on 19 July 1999 and a <br />decision was proposed on 30 March 2000. Following the third renewal, the following revisions <br />were approved: <br />Technical Revision 16, decision date 31 Mazch 2003 <br />Minor Revision 28, decision date 17 August 2001 <br />Minor Revision 29, decision date 13 November 2002 <br />Stinulations <br />All of the stipulations placed on the Eastside Mine Permit have been resolved to the satisfaction <br />of the Division and have been terminated. The following is a list of the stipulations and their <br />termination date. <br />Stipulation 1: THE PERMITTEE WILL PERFORM THE MONITORING OUTLINED BELOW <br />AND SUBMIT A HYDROLOGIC MONITORING REPORT ANNUALLY IN JANUARY TO <br />THE DNISION INCORPORATING THE FOLLOWING MONITORING DATA: SURFACE <br />WATER - 1. MONTHLY MONITORING; 2. SEMI-ANNUAL MONITORING; AND 3. <br />COMPILATION OF ALL DATA SUBMITTED TO THE COLORADO DOH FOR <br />COMPLIANCE WITH THE NPDES PERMIT SAMPLING REQUIREMENTS, INCLUDING <br />SALINITY. GROUND WATER - 1. CONTINUATION OF INFLOW STUDY, 2. PUMPAGE <br />Permit Renewal No. 4 3 12/03/04 <br />