Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agenq or organization name :Division OI Mrne2ls 8 Geology <br /> <br />Tasku: 003 State: Coloratlo PermNjob#:M-78-314 <br />Date: 17242000 County :ROUtt Abbreviation :none <br />User: ESC Site:Hewes Pif Filename'M314-003 <br /> <br />Permit or ocher job action :Reevaluate amount o1 requiretl bontl <br /> <br />Task deeCnpliOn .BaC~N ~C0110ty PIf~ <br /> <br />HOURLY EQUIPMENT COST Baait machine' Cat DeN (1996) Horsepower : 285 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis . I per tlay <br />Attachment no 2 :3-shank ripper <br /> Utilization % Cost data source: (CRG) <br />Cost Breakdown : Ownership cesUhour : $47.70 NA <br />Operating cesVhour : 555.64 100 <br />Ripper op. cosVhour: 5000 0 <br />Operator cesUhour: E23.12 NA <br />Total unit wsUhour: 8719.86 Total fleet cosVhour: 5119.86 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 500 LCY (actor: <br />Source of quantity takeaH:OMG Estimate <br />Source of est. swell tailor: NA <br />HOURLY PRODUCTION <br />I <br />Average push distance : 150 lee( <br />Unadjusteo houny production 591 LCY/hr <br />Material consistency tlescnption . <br />Conso6tlatetl stockpile <br /> <br />Average push gmdienl . 5.00 % (negJ <br /> <br />Ave29e Site altitude : B 620 legit <br />Material weight : 2,900 Ibs/LCY <br />Matenal weight description' <br />Decomposetl rock ~ 50% Rock, 50% Eann <br />Operator Skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job e0icienq <br />Spoil pile <br />Push gratlient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adlustetl unit production <br />Adjusted fleet production <br />Source <br />075 (avg) <br />L00 (Cat HBJ <br />7 00 (pen.) <br />7.00 (avg.) <br />083 (lshitt/tlay) <br />0 80 (/ntl-N) <br />7 71 (Cat HB) <br />L00 (Cat HBJ <br />0.79 (Cat HB) <br />7 00 (S or U) <br />0.44 <br />26020 LCY/hr <br />260.20 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job lime . 1.92 Hours <br />Unit cost. 80467 /LCY Total7ob cost: 5230 <br />Loose <br />NA volume: 500 LCY <br />