Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />PROJECT IDENTIFICATION <br />Agenry or organization name : Division O! MIne2/s 8 Geology <br />Task#: 002 SIaIe:CO/oratl0 <br />Date: 71242000 County :ROUtt <br />User: ESC Site:Hewes Pil <br />Permit or other )ob action :Reevaluate amount o1 required bond <br />Task description .Replace 12" topsoil on pit area <br />HOURLY EOUIPMEN7 COST Basic machine :Cat OBN (1996) Horsepower: 285 <br />Blade type :Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis: 1 per tlay <br />Attachment no. 2.3-shank upper <br /> DVIIZdVOn % Cost data source (CRG) <br />Cost Breakdown : Ownership cosVhour' $41.10 NA <br />Operating ceSVhour' $55.64 100 <br />Ripper op. cesVhour' $000 0 <br />Operator cosVhour: $23.72 NA <br />Total unit cesUhour: $779.86 Total Fleet cesVhour: E119.86 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 6,453 LCY factor: NA volume. <br />Source o/quantity take-0ft: DMG Estimate- 12'replacemenf depth <br />Source of est. swell lagor : NA <br />HOURLY PRODUCTION <br />'Job Condition Correction Factors <br />Average push distance : 150 feet <br />Unad(ustetl hourly production : 591 LCYmr <br />Matenal consistency descrption <br />Consohdatetl SPoCkpile <br />Average push gradient: 10.00 %(neg) <br />Average site altitude : 8.620 feet <br />Matenal weight : 2.100 Ibs/LCY <br />Matenal weigh) description <br />Earth -Loam <br />Operator skill <br />Material consistenry <br />Dozing methotl <br />Visibility <br />Job effcienry <br />Spoil pile <br />Push gradient <br />Alututle <br />Matenal weight <br />Blade type <br />Net cerrecVan <br />Atljustetl unit pratluclian <br />~ Adjusted Fleet pradudian <br />Source <br />0.75 (avgJ <br />1.00 (Cat HB <br />1.00 (gen.) <br />Loa favg) <br />1 22 (Cat HB) <br />7 00 /Cat HB) <br />1.10 (Cat HBJ <br />7 00 (S or U) <br />0.67 <br />394.77 <br />394.77 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size . 1 Dozers) Total lob time 16.15 <br />Unit cost. $0304 /LCY Total job cost: E7,959 <br />PermiUlob#:M-78-J14 <br />Abbreviation :none <br />Filename : M3 t 4-002 <br />6.45J LCY <br />Hours <br />