<br />11/7/83 • ~enderson Developm~ . Page 2 <br />Progress to date is as follows: <br /> Acres Mined Reclaimed Reveoetation <br />Phase 1 2.5 2.5 1.5 -0- <br />Total Surface Phase 2A 28.0 14.0 -0- -0- <br />Acreage 28 phase 2B 28.0 -0- -0- -0- <br />Phase 3 5.5 -0- -0- -0- <br />Total Surface 36 16.5 1.5 -0- <br />Acreage <br />Thus, the total being mined or disturbed at present is <br />approximately 16.5 acres. Next year (1984) the operator hopes <br />to complete Phase 2A mining and begin Phase 2B and complete <br />Phase 1 reclamation. In 1985, Phase 2B mining should be <br />completed, then Phase 3 mining should be undertaken with the <br />crusher, etc. being located either on Phase 1 or property to <br />the north. Phase 2 reclamation will be undertaken at the <br />same time until 1986. Revegetation will then occur through- <br />out the site in late 1986 or early 1987. The reason for this <br />is because of the smallness of the site and the need to move <br />equipment and stockpiles. Any revegetation earlier would <br />probably be destroyed. Thus, for bonding purposes, I would <br />suggest the following: <br />Max. Revegetated Area 11 acres x 1742/acre = 19,162 <br />Max. Reclaimed Area at any one time 7 x 1062 = 7,455 <br />$26,617.00 <br />Thus the applicant will have to provide a new financial <br />warranty to replace the old. <br />I hope the above is sufficient to explain progress to <br />date and the technical revisions being undertaken. Please let <br />me know if anything further is needed. In the future, I'll <br />make sure the annual report is filled out on time. <br />Sincerely, <br />~~o ~ ~~, f <br />Robert N. Fleming ~J <br />RNF/bsm <br />CC: Phil Spano, Henderson Development <br />Mike Siegrist, Siegrist Construction Co. <br />(.l%~SS ~(14AN ll Ac.2c,~ Q(, @Vf~2 Wb /Z C~V C>'b ,BL-ZAU.st S,n~c_= oG J~HASr-~ <br />~ AY, 2e~Aoy (Pr/TJJkcsn~ Lam, <br />